My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manual No.F6015 <br /> April 15,1997 <br /> INSTALLATION <br /> SMITH , <br /> Two-piece Secondary <br /> Containment Pipe & Fittings <br /> IMPORTANT • READ THIS FIRST <br /> Before beginning actual assembly proce Fiberglass fillers are required for all ad- Socket joints behave entirely differently <br /> dures,read and make sure all individuals hesive kits when installing two-piece fit- than tapered bell and spigot joints in rela- <br /> involved in the installation thoroughly tings. Each adhesive kit size(standard or tion to weather conditions. The adhesive <br /> understand the following suggestions and large)has a corresponding fiIIer kit. in socket joints may try to"run out"dur- <br /> precautions: Use of approved field scarfing tools is rec- ing the hot summer months. The adhe- <br /> You must use Manual No.F6000(or ommended to obtain a uniform scarf di- sive needs to be thick(filled)and viscous <br /> F6010 with CHEM THREAD®product) mension and a snug fit. During set up of during assembly of socket joints. (Note: <br /> with these instructions. the scarfing tools,dry fit to make sure the This is exactly opposite the requirement <br /> two halves of the fittings close together for a thin layer of adhesive for the tapered <br /> In all cases,the bonding surfaces must be g joints used in the primary piping.) While <br /> clean and dry before applying adhesive. completely on both sides(see Fig.6). <br /> All bondingsurfaces must factory fresh Hand sanding to obtain a scarf may result applying adhesive,use pressure on the <br /> ry <br /> in appearance. When machined ends have n teither too muchor too in removal of brush to"wet out"machined surfaces be- <br /> been stored in direct sunlight,surfaces will little material. fore applying a thick layer of adhesive. <br /> weather and result in loss of bond strength. Do not move secondary containment The instructions for assembling the prima- <br /> When surfaces are weathered,sand or re- joints prior to adhesive cure. ry piping are shown in Manual No.F6000 <br /> scarf spigots and sand sockets to achieve a (or F6010 for CHEM THREAD product), <br /> factory fresh appearance. Joint strength is essentially controlled by which must be used with these instruc- <br /> the adhesive thickness in the socket joints. tions for containment systems. <br /> INTRODUCTION epoxy resin pipe. Note: Other types of contain- <br /> These instructions cover only the assembly of the ment pipe are available on special order; however, <br /> secondary system. Manual No. F6000 (or F6010 for the joint fit for standard containment fittings must <br /> CHEM THREAD product) must be used with these in- be checked for the various types of pipe. Fittings <br /> structions. Procedures common to both systems, are manufactured with vinyl ester resin and randomly <br /> such as cutting, handling, adhesive mixing, etc., are oriented glass fibers. Fitting manufacturing process is <br /> presented in Manual No. F6000 and F6010. by either the compression molding process, or the <br /> These installation instructions are for low pressure contact molding process. Contact molding includes <br /> (drain) secondary containment systems. All refer- spray-up and/or hand lay-up process. <br /> ences to secondary containment systems in these in- <br /> structions are related only to low pressure,gravity <br /> drain systems. (Note: A KwiKey®mechanical joint <br /> secondary containment product line is available for <br /> higher pressure secondary containment systems. <br /> These higher pressure systems require separate instal- <br /> lation procedures that are not referenced in these in- <br /> structions.) <br /> The secondary containment system is designed for <br /> use with RED THREAD®II, GREEN THREAD*, POLY <br /> THREAD®and CHEM THREAD primary (product) <br /> i <br /> pipe. " <br /> The secondary containment piping system consists <br /> of the next larger pipe size (as a minimum) and spe- <br /> cial two-piece fittings. The standard secondary con- <br /> tainment pipe is RED THREAD II, a filament wound <br /> SMITH FIBERGLASS PRODUCTS INC.-A SUBSIDIARY OF A.O.SMITH CORPORATION <br /> 2700 W.65TH ST.,LITTLE ROCK,AR 72209-8592.501-568-4010- FAX 501-568-4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.