My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Containment Installation Instructions <br /> SEMON 2 (see Fig. 1). Thermoplastic snap-on centralizers are <br /> System Layout used for smaller sizes—up to 6"primary. Bond-on <br /> centralizers are used on larger sizes. Use%b"thick <br /> A. Primary Piping-Assemble primary piping accord- double-sided foam tape inside the thermoplastic <br /> ing to the installation instructions in Manual No. centralizers to hold them in place. Sand the prima- <br /> F6000 (F6010 for CHEM THREAD product). ry pipe O.D. before attaching bond-on centralizers. <br /> B. Containment Piping-In some cases, the proce- Note: Thermoplastic centralizers will be much stiffer <br /> dures for tapered joints from Manual No. F6000 in cold weather. Treat similar to adhesive;prewarm <br /> are required for assembling secondary contain- in cold weather before attempting installation. <br /> went joints. Shown in Figs. 2, 3, and 4 are cou- <br /> pling joints that may be either standard tapered Careful planning of the pipe layout will allow in- <br /> couplings or two-piece containment couplings. spection of the primaryjoints by moving the sec- <br /> Pipe ends joined to containment fittings must be ondary containment pipe along the primary pipe <br /> scarfed, while pipe ends joined to tapered cou- (see Figs. 5 and 6). During the layout planning, it <br /> plings must be tapered spigots. may be necessary to include a two-piece sec- <br /> ondary containment coupling in the layout to al- <br /> Containment pipe is placed over the primary pipe low additional clearance for inspecting the prima- <br /> during assembly of the primaryjoints. As the pri- ry joints. It is a good practice to obtain a few <br /> mary pipe is assembled,centralizers are bonded to extra two-piece couplings for the containment <br /> or snapped on the primary pipe depending on size. system in case it is necessary to provide clearance <br /> Smith Fiberglass supplies two types of centralizers for inspecting the inner pipe. <br /> Arn <br /> Product Piping <br /> FY <br /> . w.< Fi�2 <br /> R <br /> Figure 73 Figure 4 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.