Laserfiche WebLink
INTRODUCTION <br /> INTRODUCTION SAFETY <br /> zA This safety alert symbol indicates an important <br /> FIBER GLASS SYSTEMS safety messsage. When this symbol is visible, be <br /> PIPE INSTALLATION HANDBOOK alert to the possibility of personal injury. <br /> UL/ULC Listed CAUTION <br /> RED THREAD IIA Product Primary and This pipe may carry hazardous material and/or operate <br /> Secondary Containment Pipe and Fittings at a hazardous pressure level; therefore, it is imperative <br /> the instructions in this manual are followed to avoid serious <br /> This manual is offered to assist in the proper fabrication personal injury or property damage. In any event,improper <br /> and installation procedures when assembling Fiber Glass installation can cause injury or damage. Installers should <br /> Systems(FGS)piping systems. read and follow all cautions and warnings on adhesive kits, <br /> heat packs, propane torches, etc. to avoid personal injury. <br /> This manual covers the installation procedures for FGS Also, observe general safety practices with all saws,tools, <br /> RED THREAD IIA primary and secondary containment pipe etc.to avoid personal injury. Wear protective clothing when <br /> and fittings. necessary. Make sure work surfaces are clean and stable <br /> Part one details installation procedures for 2",3",and 4"(50, and that work areas are properly ventilated. <br /> 75, and 100 mm)diameter primary product piping. <br /> Part two explains installation procedures for 3",4"and 6"(75, INSTALLATION TRAINING SEMINARS <br /> 100 and 150 mm)diameter secondary containment piping. Fiber Glass Systems requires installers to attend training <br /> every three years by a factory-trained representative. Fiber <br /> Glass Systems offers in-depth training seminars covering <br /> ENGINEERING AND PRODUCT DATA: both primary product and secondary containment piping <br /> FGS provides Success by Design software to perform installation procedures. The training seminar involves hands- <br /> flow and other calculations. Included in on participation,and each attendee receives a complete FGS <br /> the CD-Rom is a complete catalog and Smith Fibercast Petroleum Marketing Catalog containing <br /> installation video. Contact your FGS installation manuals used during the seminar. Each installer <br /> representative to obtain a copy or visit We attending also receives documentary proof of attendance. <br /> our web site at www.smithfibercast.com/ <br /> ULPiping.htm. It is recommended that anyone directly involved in <br /> underground piping installations attend the FGS Smith <br /> Fibercast installation training seminar. For information <br /> on training seminars, contact your local distributor or <br /> Fiber Glass Systems' products must be installed and used in representative. <br /> accordance with sound,proven practice and common sense. <br /> To assist installers with proper installation of fiberglass <br /> The information supplied by FGS in its literature must be piping systems, Fiber Glass Systems has prepared a Red <br /> considered as an expression of guidelines based on field Thread IIA Installation Checklist for Underground Petroleum <br /> experience rather than a warranty for which FGS assumes Pipe. This sheet is included in the FGS Smith Fibercast <br /> responsibility. FGS offers a limited warranty of its products in the Petroleum Marketing Catalog and accompanies each <br /> Terms and Conditions of Sale. The information contained in the bundle of pipe. For a copy of this checklist, contact your <br /> literature and catalogs fumished by FGS cannot ensure,of itself, local distributor or representative. <br /> a successful installation and is offered to customers subject to <br /> these limitations and explanations. <br /> Publications available: <br /> It is the policy of Fiber Glass Systems to improve its products B2101 RED THREAD IIA Product Brochure <br /> continually. Therefore, the company reserves the right, without 82102 General Specifications <br /> notice,to change specifications and/or design at any time without B2104 Vacuum Monitoring System <br /> incurring an obligation for equipment previously sold. Descriptions B2107 Single-Wall Sump Entry/Termination Fitting <br /> contained in this catalog are for the purpose of identification and 82108 Bonded Sump Entry/Termination Fitting <br /> neither limit nor extend the standard product limited warranty set 82109 Gasketed Sump Entry/Termination Fitting <br /> forth in the Terms and Conditions of Sale and Trade Customs. 82161 RED THREAD IIA Installation Checklist <br /> F6600 1"-6"Tapering Tool Instructions <br /> F6625 Model 2100 Power Tool Instructions <br /> F6624 Model 2102 Power Tool Instructions <br /> Case Histories <br /> F6640 Operating Instructions for Electric Heating Collar <br /> II <br />