My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Primary Piping System Installation <br /> INSPECTING FOR POTENTIAL TESTING RECOMMENDATIONS <br /> CAUSES OF JOINT FAILURE <br /> Joint Backout - When assembling a bell and spigot joint, <br /> a bead of adhesive is normally formed at the edge of the <br /> bell. If the joint is not locked up and backs out before the <br /> adhesive cures, the bead will no longer be next to the edge Safety Precautions <br /> of the bell. FIBER GLASS SYSTEMS SHALL NOT BE LIABLE <br /> Cocked Joint- If a joint is cocked or misaligned, there will UNDER ANY WARRANTY, CONTRACT, OR IN <br /> usually be a large gap between the bell and spigot on one TORT, FOR ANY RESULTING INJURY TO PERSON- <br /> side.The opposite side will usually have a smaller or no gap. NEL OR DAMAGE TO EQUIPMENT, PIPE, OR <br /> Misalignment is easier to detect if one sights down the line OTHER PERSONAL PROPERTY FOR FAILURE TO <br /> and views the joint from a distance. FOLLOW THE PROCEDURES AND COMPLY WITH <br /> THE PRECAUTIONS SET FORTH. <br /> NOTE: When using heat assist, the pipe may bend if it is <br /> under stress while curing. In this case itis extremely difficult As in any system where pressure is employed,adequate <br /> to determine if the pipe is bent because of heating or if it is safety precautions should be exercised. EXERCISE <br /> a cocked joint. Avoid making up pipe and fitting joints when DUE CARE IN INSTALLING AND TESTING THE PIPING <br /> SYSTEM. <br /> pipe is under stress. <br /> Improperly Cured Joint - If the adhesive bead is soft or In buried applications,it is suggested that long pipe runs <br /> flexible, the adhesive is not sufficiently cured. If the bead is be partially backfilled at various points to secure them in <br /> cured,it is hard and brittle when checked with a knife. When place. All joints and connections should be left exposed for <br /> the bead is not hard after exposure to the recommended inspection. <br /> temperature and time cycle, the adhesive was not mixed FIBER GLASS SYSTEMS RECOMMENDS THAT YOU <br /> properly. CAUTION: The adhesive bead will cure faster DO NOT TEST ANY INSTALLATION WITH AIR OR GAS <br /> than the adhesive in the joint. It is important that the joint BECAUSE OF THE SAFETY HAZARDS CREATED. The <br /> not be pressurized until it has been subjected to the proper <br /> time-temperature cure cycle. A temperature vs. time-to- lightweight,flexibility,and elasticity of fiberglass pipe creates <br /> pressure chart is included in the instructions packed with different conditions than are present with steel pipe. If a <br /> each adhesive kit. failure should occur while testing fiberglass pipe with <br /> air or gas,the system would be subject to considerable <br /> Weather Damage-If a joint has been exposed to sunlight for whipping and other shock-induced conditions due to <br /> a long period of time and the machined area has turned from the sudden release of stored energy. The violent release <br /> white in color to yellow or brown and was bonded without can cause severe personal injury or death to personnel <br /> a proper repair, the joint may be suspect and could leak or in the area and can also cause property damage to the <br /> even separate. Inspect for color change on all machined pipe or other property. <br /> areas before bonding. <br /> If a line is tested with air or gas, Fiber Glass Systems <br /> Although not all inclusive, the conditions mentioned well not be responsible for any resulting injury to personnel <br /> above are the most common indications of failure to achieve or damage to property, including the pipe. If there is no <br /> a properly assembled joint. alternative to testing with air or gas,FGS will recommend test <br /> procedures and precautions to minimize possible hazards <br /> All damaged or improperly assembled joints must be but will not bear responsibility for damage or injury under <br /> replaced. See Repair Procedures on pages 14-15. any circumstances. Such testing is done entirely at the <br /> risk of those involved. <br /> Test Procedures - Installed FGS Smith Fibercast pipe <br /> systems should be tested prior to use to assure soundness of <br /> all joints and connections.In testing,sudden pressure surges <br /> or"water hammer" must be avoided, as in some instances <br /> surge or hammer can produce pressures of several times <br /> the rating of the pipe and fittings. Locate pressure gauge in <br /> close proximity to the pressurizing equipment,not directly on <br /> the piping system. Pressure gauge with the test pressure at <br /> mid scale is recommended. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.