Laserfiche WebLink
Monitoring System Certification <br />Site Address: <br />. T <br />RED DIESEL <br />P <br />El <br />UST Monitoring Sias Plan <br />�y <br />r <br />San Joaquin Hospital & Engineering Plant 500 W Hosplialfr6rics ta KEY <br />A = ANNULAR <br />F = FILLS <br />T — TURBINE <br />. . . . P - PROBE <br />V- VAPOR <br />X - SUMP SENSOR <br />L—LD <br />. . . M — Manway <br />. . . . . . . . . . . . . . . . B — Brine Sensor <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I - Smart Sensor <br />S=STP <br />C = Floats & Chains <br />E — E Stop <br />Gen 1 <br />'PIPING " <br />Drawing of piping <br />exit of sump. No <br />underground is <br />drawn, cannot <br />speculate. <br />8-25-16 <br />Gen 2 <br />. . une continues to Boilers . . . . . OPW Tank Gauge <br />HOFFICE . . . . . . . <br />est Port <br />Date map was drawn: 8-25-16 <br />tf you already have a diagram that stows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site pian, <br />show the general layout of tanks and piping. Curly Identify locations of the follaWng equipment, tf Installed: monitoring system control panels; sonars monitoring tank <br />annular spaces, sumps, dispenser pans, split containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, rote the date this Site Plan was prepared. <br />Montoring System Coriification Page 4 of 4 2121/07 <br />