My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:54:59 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. in -Tank Gauging l SIR Equipment: ® Check this box If tank gauging is used only for inventory control. <br />❑ Clic this box if no tank gauging or SIR equipment Is Installed. <br />This section must be completed N In -tank gauging equipment Is used to perform leak detection monitoring. <br />Complete the following checklist: <br />161 0 1 111— <br />❑ Yes ❑ No` Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No" Were all tank gauging probes visually Inspected for damage and residue buildup? SEE <br />1 <br />❑ Yes ❑ No` Was accuracy or system product level readings tested? <br />❑ Yes ❑ No` Was accuracy of system water level readings tested? 1 <br />Yes ❑ No` Were al probes reinstalled properly? <br />❑ Yes ❑ No` Were al items on the equipment manufacturer's maintenance checklist completed? <br />• in Section H, below, describe how and when these deficiencies were or will be corrected. <br />Lina Leak Detectors (LLD): ® Check this box If LLDs are not installed. <br />----- ---------------- <br />❑ Yes <br />❑ No` <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all UW apply) <br />® WA <br />Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h; ❑ 0.2 g.p.h. <br />❑ Yes <br />❑ No` <br />Were all L Ds confirmed operational and accurate within regulatory requirements? <br />❑ Yes <br />❑ No` <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ NV <br />For mechanical LLDs, does the LLD restrict product flow If it detects a leak? <br />® N/A <br />❑ Yes <br />❑ No' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® WA <br />❑ Yes <br />❑ No` <br />For electronic LLDs, does the turbine automatically shut off if any portion of the nonitoring system Is disabled or dlaconnected? <br />® NA <br />❑ Yes <br />❑ No` <br />For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system malfunctions or fails a test? <br />® NA <br />❑ Yes <br />❑ ho" <br />For electronic LLDs, have an accessible wiring connections been visually inspected? <br />® NA <br />❑ Yes <br />❑ No` <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />In Section H, below, describe how and when these deficiencies were or slim to corrected. <br />H. Comments: GENERATOR FOR A HOSPITAL NO LEAK DEFECTOR ALLOWED <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.