Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />C, Page oaf <br />5. SECONDARY PIPE TESTING <br />X Piping Manufacturer Industry Standard !.1 Proksisf6fiat <br />171 Other (Specify) <br />Test Method Used: <br />X Pressure <br />Other (Specify) <br />❑ Vacuum 1-j Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: I/10 x 15 Psi <br />Piping Run #1 <br />Piping Run # 2 Piping Run # <br />Piping Run # <br />Piping Material: <br />I Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 250' <br />Approx. 250' <br />Product Stored: <br />Dyed Diesel Supply <br />Dyed Diesel Return <br />Method and location of <br />piping-run isolation: <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at STP <br />Piping Sump #1 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />10:35 <br />10:35 <br />Initial Reading (Rj): <br />5 Psi <br />5 Psi <br />Test End Time: <br />11:35 <br />11:35 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />Test Duration: <br />I Hour <br />I Hour <br />Change in Reading (RF-R,): <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />Test Result Pass Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />