My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:54:59 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Test Method Developed By: <br />C, Page oaf <br />5. SECONDARY PIPE TESTING <br />X Piping Manufacturer Industry Standard !.1 Proksisf6fiat <br />171 Other (Specify) <br />Test Method Used: <br />X Pressure <br />Other (Specify) <br />❑ Vacuum 1-j Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: I/10 x 15 Psi <br />Piping Run #1 <br />Piping Run # 2 Piping Run # <br />Piping Run # <br />Piping Material: <br />I Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 250' <br />Approx. 250' <br />Product Stored: <br />Dyed Diesel Supply <br />Dyed Diesel Return <br />Method and location of <br />piping-run isolation: <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at STP <br />Piping Sump #1 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />10:35 <br />10:35 <br />Initial Reading (Rj): <br />5 Psi <br />5 Psi <br />Test End Time: <br />11:35 <br />11:35 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />Test Duration: <br />I Hour <br />I Hour <br />Change in Reading (RF-R,): <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />Test Result Pass Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.