My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:54:59 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Ll <br />gc of <br />Test Method Developed By: 11 Sump Manufacturer E Industry Standard X Professional E 1. 21 01115 <br />[I Other (Specify) <br />Test Method Used: I] Pressure 1,1 Vacuum X Hydrostatic`k, Ril M -- <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />MENEM= <br />Sump# I <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />42" <br />Sump Depth: <br />48" <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />26" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />32" <br />Condition of sump prior to testing: <br />Dry <br />Portion of Sump Tested' <br />Water Line 28" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />N/A <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail-safe <br />shutdown?* <br />N/A <br />Was fail-safe verified to be <br />operational?* <br />N/A <br />Wait time between applying water <br />and starting test: <br />5 Minutes <br />Test Start Time: <br />10:50 <br />Initial Reading (Ri): <br />.001 <br />Test End Time: <br />11:20 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading (RF-Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Was sensor properly replaced and Yes <br />verified functional after testin? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Tank System is for Emergency Generators and Boilers. <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to an of the questions indicated with an <br />my <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.