Laserfiche WebLink
PIPING ITESTING <br />Test WletltOd E3j/::0:Manufacturer •Industry Standard o Professional Engr, o Other (see be <br />T 8 Metitod USW O Pressure C7 Vacuum •Hydrostatic (� ©ther (see below) <br />Measuring Equipment Used: Lev81 Ghange tndIle {Caldwell System 20Q1 !'.Walton Engineering) <br />®escription1`anki #1 Tank #2 Tank 3 <br />Sump Material <br />FRP <br />FRP <br />FRP <br />Sump Diameter (inches) <br />42 <br />42 <br />42" <br />Sump Depth (inches) <br />59' <br />54" <br />55" <br />Product Stored <br />Gasoline - 87 <br />Gasoline - 91 <br />Diesel <br />Height from tank top to highest <br />22" <br />24" <br />14" <br />piping penetration <br />Height from tank top to lowest <br />15" <br />15" <br />16" <br />electrical penetration <br />Condition of sump prior to testing <br />Dry <br />Wet <br />Wet <br />Portion of sump tested <br />Entire <br />Entire <br />Entire <br />Is system programed for fail-safe operation? <br />Unknown <br />Unknown <br />Unknown <br />Was fail-safe verified to be operational? <br />No <br />No <br />No <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Yes <br />Was sensor properly replaced after testing? <br />Yes <br />Yes <br />Yes <br />Wait time for water level to stabilize (hr:min) <br />0:30 <br />0:20 <br />0:16 <br />Depth of water level from tank top (inches) <br />26" <br />28" <br />24" <br />Test start time <br />11:50 AM9:10 <br />AM <br />9:11 AM <br />Test end time <br />12:20 PM <br />9:40 AM <br />9:41 AM <br />Test duration (hr:min) <br />0:30 <br />0:30 <br />0:30 <br />Change in water level (# 0.000 inches) <br />0.000 <br />0.000 <br />0.000 <br />Pass/Fail threshold (0.005 inches / %: Hr.) <br />0.005 <br />0.005 <br />0.005 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />Comments: <br />Note: This facility is an unmanned cardlock. <br />The monitoring system <br />was not accessible <br />to verify Prowammina or sensor status. <br />0 2002 Watton Engineering, Inc <br />