Laserfiche WebLink
SECONDARY Vr <br />Testetht)d By: Martufacturer •Industry Standard professionalngr, O Other (see below) <br />Test IwetilDd Uses:• ftAessure 0 Vacuum 0 Hydrostatic 0 Other. (see below) <br />flAeasuring EquipmentUsed Pressure Gauge (range0to 10 psig) <br />Decriptbn P�tind gun #7 Piping Run #2 Piuina Run #3 Pirina Run #4 <br />Pipe Manufacturer <br />Ameron <br />Ameron <br />Ameron <br />Ameron <br />Pipe Type <br />FRP <br />FRP <br />FRP <br />FRP <br />Primary Pipe Diameter (inches) <br />2 <br />Z. <br />3" <br />2" <br />Secondary Pipe Diameter (inches) <br />3" <br />3" <br />4" <br />3" <br />Product Stored <br />Gasoline - 87 <br />Gasoline - 91 <br />DieselDiesel <br />(7/8 - 8 Sat.) <br />Method of secondary pipe isolation <br />Termination Boot <br />Termination Boot <br />Termination Boot <br />Termination Boot <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Sump <br />UDC <br />Estimated length of piping run (feet) <br />110' <br />80' <br />130' x <br />25' <br />(include length of branch runs) <br />Wait time for pressure to stabilize (hrmin) <br />0:15 <br />0:11 <br />Unable to Pressurize <br />Not Testable <br />Test start time <br />10:30 AM <br />10:31 AM <br />10:32 AM <br />Initial pressure (psig) <br />" 5 <br />5 <br />0 <br />Test end time <br />11:30 AM <br />11:31 AM <br />10:32 AM <br />Final pressure (psig) <br />5 <br />5 <br />0 <br />Test duration (hours:minutes) <br />1:00 <br />1:00 <br />0:00 <br />Change in pressure (psig) <br />0 <br />0 <br />0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />FAIL PSI <br />FAIL <br />Comments: <br />Line #4 serves the satellite to master dispenser #8. <br />This line was not able to be tested <br />due to the condition of the termination boot in the UDC for dispenser <br />#7/8. <br />© 2002 Walton Engineering, Inc. <br />