My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
444
>
2300 - Underground Storage Tank Program
>
PR0231692
>
COMPLIANCE INFO_2001-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 11:29:54 AM
Creation date
6/3/2020 9:51:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2009
RECORD_ID
PR0231692
PE
2361
FACILITY_ID
FA0000212
FACILITY_NAME
Mossdale Chevron
STREET_NUMBER
444
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
444 W MOSSDALE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231692_444 W MOSSDALE_2001-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul 26 06 08:36p Mike Dotten 209-533-2650 p,3 <br />4 <br />Facility Name: Mossdale (Page 3) <br />In -Tank Gauging / SIR Equipment: <br />OCheck this box if tank gauging is used only for inventory control. <br />❑Check this box if no tank gauging or SIR equipment is installed and disregard the following section. <br />t otn lets tae f0110 hig checklist: <br />® Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for grotmd faults? <br />® Yes ❑ No* Were all tank -gauging probes visually inspected for damage and residue buildup? <br />® Yes ❑ NO Was accuracy of system product level readings tested? <br />® Yes ❑ No* Was accuracy of system water level readings tested? <br />® Yes ❑ No* Were all probes reinstalled properly? <br />® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how.and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed and disregard the following section. <br />® Yes <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: ® 3 g.p.h.; ❑ 0.1 gp.h ; ❑ 0.2 g.p.h. <br />® Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />0 Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® N/A <br />❑ Yes <br />❑ No* <br />® N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfuncti,ans <br />® N/A <br />or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® N/A <br />® Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section <br />N_ <br />heMw_ d"er.ha h— .-A -16— «1........l_r._:_____ _ <br />r6.1i Va VVni UV 9;Urrswte®. <br />H. Comments: The facility was observed to be in compliance <br />
The URL can be used to link to this page
Your browser does not support the video tag.