Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.siaov.org/ehd <br />CONTINUATION FORM <br />Page: 4 of 5 <br />OFFICIAL INSPECTION REPORT <br />Date: 04/24/14 <br />Facility Address: 444 W. Mossdale, Lathrop <br />Program: UST <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />204. The designated operator failed to verify if all employee have been trained during the monthly <br />inspection (see Violation #206 below). During the monthly inspection, the designated operator shall <br />verify that all facility employees have been trained. Ensure that designated operators performing <br />monthly inspections at this facility are including all of the required information on the reports. <br />203. About a quart of fuel was observed in the Dispenser #1/2 UDC sump, and about one cup in <br />Dispenser #7/8 UDC sump, and the releases were not recorded. Any release from the primary <br />containment that does not escape the secondary containment and was cleaned up within eight hours of <br />being detected shall be recorded with the following information: <br />1. Operator's name and phone number <br />2. List of types, quantities, and concentrations of hazardous substances released <br />3. Description of actions taken to control and clean the release <br />4. Method and location of disposal of the released substances <br />5. Description of actions taken to repair and prevent future releases <br />6. Description of method used to reactivate interstitial monitoring after repair or replacement of <br />primary containment <br />Immediately record this release with the information required, and maintain it on site with the facility's <br />monitoring records. Submit a copy of the recordable release statement to the EHD by May 24, 2014. <br />206. The designated operator employee training for Jahmilya Akbar, who has been employed since <br />October 2013, could not be verified since training log did not include her name or signature. The <br />designated operator shall train facility employees for which he or she is responsible in the proper <br />operation and maintenance of the UST system once every 12 months. The training shall include, but is <br />not limited to: <br />1. Operation of the UST system in a manner consistent with the facility's best management practices <br />2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br />3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br />4. Name of the contact person(s) for emergencies and monitoring equipment alarms <br />Ensure that employees have been trained by the designated operator, maintain the list on site, and <br />submit a copy of the training records to the EHD by May 24, 2014. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANYTIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector: <br />Received By -Title: <br />Jeffrey Wong (209) 468-0335 <br />-&i/ <br />/ <br />EHD 23-02-003 Rev 04/19/12 1 CONTINUATION FORM <br />