Laserfiche WebLink
p <br /> A, <br /> ., <br /> TLS-350 Monitoring System Requirements Assist ISD <br /> ®TLS-350 with ECPU2 Pan NufflerRequiremra <br /> •NVMEM 203 330020-445 AWMVaporFlowMeterKlt 1 perdislerwr <br /> a RS-232 Interface Module for On-site PC report access 330020-515 Wired Vapor Pressure Sensor tett <br /> r Smart Sensor Module 861190-201 "'Wireless Vapor Pressure Sensor IOtp 1 per site <br /> •Dispenser Interface Module(DIM) 330020-715 Vapor Pressure Sensor site Start-up Kit= <br /> •ISD Software Enhancement Module(SEM) 332250.110 Seven Input Smart Sensor Modules 1 <br /> per seven or eight <br /> e Site Shutdown Control 1 iardware 329356-DO4 Eight Input Smart Sensor Module smart sensors <br /> Alarm Table Balance ISD <br /> The following table contains a list of warnings and alarms posted or Part NumeP onatow R <br /> equiremw <br /> used by the TSD system: 330020-585 Barance Vapor Flow Meter rot 1 <br /> per dispenser <br /> Balance Assist <br /> tSD Iso Warning � Description 33DO20-515 Wired Vapor Pressure Sensor Kit' <br /> 861190-201 Wirers Vapor Pressure Sensor Kttz 1 per site <br /> X X ISO DEGRO PRESSURE 30 7F percentile of 30 days'ullage <br /> pressure that exceeds 0.3[We 330020.715 11 Vapor Pressure SensorSite Start-up Kit, <br /> X X ISD GROSS PRESSURE 7 9511 percentile of 7 days'uttage 332250-001 Seven Input Smart Senior Modules 1 per seven or eight <br /> pressure that exceeds 1.3 IWC <br /> 32 Fight Input Smart Sensor Module Smart Sensors <br /> X X ISD VAPOR LEAKAGE 7 Containment system leaks at two 847490$15 PMC Poet Cdhtr%,Module' 1 per TLS Console <br /> times the TP 201.3 d <br /> X X ISO SENSOR OUT 7 Failure of Sensor Self-test <br /> TLS-350Software/Memory <br /> X X ISD SETUP 7 Failure of Setup Test Upgrade Options for ISD <br /> X Him:DEGRO COLLECT 7 7-day Degradation AIL Test Part Numer Description Requi <br /> remexit <br /> X Han:GROSS COLLECT 1 1-day Gross AIL Test Warning 331500-358 ECPU2,latest V=software,NVMEM 203 <br /> X Hnn:FLAW COLLECT t Vapor collection flow perfomance 3315DD-322 LatestV.3XX software,NVMEM 203 <br /> s less than 50% 332966-203 NVMEM 203 import storage; 1 per Console <br /> X ISO VP PRESSURE 1 percentile e1-day 330160-004 ISD Software Enhancement Module(SEM) <br /> e <br /> Pressure exceeds 2.5IWC 1VdC <br /> X ESO VP EMISSIONS 1 Mass emission exceeded the <br /> 331500.353 TLS V.3XX softw are <br /> certified threshold <br /> Failure of Vapor Processor Effluent Optional ISD Components <br /> X ISO Sirius 1 Emissions or Duty Cycle Test <br /> Part Numer DesciriPtion Requirement <br /> 331408-001 Dispensed Control Module for Single 1 module per <br /> Typical ISD Configuration Dispenser Shutdown 4dispensers <br /> Cadren Canister i 330X120-630 Vapor Pressure Sensor Kit for Mounting 1 per Console <br /> a on vert Stack <br /> 1 <br /> 1 1 per Pressure Sensor <br /> Dispenser Island q 330020-716 Universal Enclosure Box when mounted on <br /> r Vent Stack <br /> 330020-717 xnv Vapor Pressure sensor Drying Tube Kit Replacement Part <br /> TLS Comate ISD <br /> Pressure KFIW.wmeter <br /> o — Sensor <br /> a1.Can only be used on wired installations. <br /> et a 2. Can only be used on wireless installations. <br /> n 3.Required when ordering 861190-201 sensor for wireless installations. <br /> utt1roIon 2) 1 4.Only required for VST Vapor Pro.. <br /> iia vired a 1 5.At least one seven channel module required when installing Carbon Canister Vapor <br /> iaa 1Polisher,optional on all other tSD sites. <br /> t I_ — <br /> ISD Pressure seam <br /> mmummu dPUM 11 <br /> rsd <br /> mw0* To learn more,contact us at 888.561.7942,or visitw.veeder.com. <br /> hz <br /> 125 Powder Forest Drive,PO.Box 2003,Simsbury.CT 06070 USA <br /> ©2013 Ueeder-Root Company a 576047-065 Rev,F a Printed in USA <br />