Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 4 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: x Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: x Pressure ❑Vacuum ❑ Hydrostatic <br /> ❑Other(Spec) <br /> OTestquipment Used: Mc Daniels 4"gauges Equipment Resolution: .025 r/s <br /> Piping Run#1 trans Piping Run#2 reel Piping Run# Piping Run#Material: Fiberglass Fiberglass <br /> Manufacturer: Smith Smith <br /> Piping Diameter: 4"x 3" 4"x 3" <br /> ti <br /> Length of Piping Run: 36' 24' <br /> Product Stored: Jp8 Jp8 <br /> Method and location of Test boot Test boot <br /> i ping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min 10 min <br /> starting test: <br /> Test Start Time: 11:45 10:30 <br /> Initial Reading(Rj): 5 lbs 51bs <br /> Test End Time: 12:45 11:30 <br /> Final Reading(RF): 5 lbs 5 lbs <br /> Test Duration: I hr 1 hr <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria <br /> I e ull�, x I'-as?s ❑Fail x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />