My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:09:15 PM
Creation date
6/3/2020 9:51:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comments - (include information on repairs. made prior to testing, and recommended follow-up for failed tests) <br />loot- <br />17it,t; t7Ut�1 j a 20M T'RAt3SaTlawi +0 PEF,L- <br />1 P 9 Ai 6- R .) till .Z ^ 6 NA STP S.0 M? -M ry?IaN C e ; 10 t3 li f <br />11 <br />SWRCB, January 2002 <br />Page of <br />` <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />CKPiping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />Pressure <br />❑ Vacuum <br />❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: MC. <br />0L1QI cLx 4,v <br />Equipment Resolution: , SD D <br />RUN 11111HIM <br />Piping Run #' <br />Piping Run #2 <br />Piping Run # Piping Run # <br />Piping Material. <br />t=1e3Ee GLASS <br />tICZ6LAS- <br />Piping Manufacturer: <br />5 M CTA <br />5nn t -1-ti ' <br />Piping Diameter: <br />y <br />y +1 <br />Length of Piping Run: <br />?-0 <br />1 S <br />Product Stored: <br />?13 <br />Method and location of <br />i in -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 n 11.J <br />tA ► wl <br />Test Start Time: <br />11'(30 <br />110 <br />Initial Reading (R1): <br />c 0> <br />S `6S <br />Test End Time: <br />ill p 0 <br />'2'.10 <br />Final Reading (RF): <br />G L ! <br />Test Duration: <br />t <br />' µe <br />Change in Reading (RF -R1): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 Q <br />4 mop <br />Fa$s. . z��FPass.r ::❑ FAII : <br />❑pass ...(].Fail.~ ❑ _Puss [7Fa. <br />Comments - (include information on repairs. made prior to testing, and recommended follow-up for failed tests) <br />loot- <br />17it,t; t7Ut�1 j a 20M T'RAt3SaTlawi +0 PEF,L- <br />1 P 9 Ai 6- R .) till .Z ^ 6 NA STP S.0 M? -M ry?IaN C e ; 10 t3 li f <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.