Laserfiche WebLink
C <br />SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer Klndustry Standard <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure 0 Vacuum <br />0 Other (Specify) <br />Page of <br />❑ Professional Engineer <br />( Hydrostatic <br />Test Equipment Used: = wr_aj TS S rS <br />Sump # I Sump # <br />Equipment Resolution: p®Z• <br />Sump # Sump # <br />Sump Diameter: t�Z <br />Sump Depth: 32" <br />Sump Material: C LA S S <br />Height from Tank Top to Top of A I <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: t <br />Condition of sump prior to testing: Ge0D <br />Portion of Sump Tested' V p,PjCW; PROWC- <br />Does turbine shut down when <br />sump sensor detects liquid (both 4 Yes 0 No ❑ NA <br />product and water)?* <br />❑ Yes ❑ No 0 NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?* Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />Was ail -safe verified to be <br />ai f <br />operational?* nal?� K Yes 0 No ❑ NA <br />❑ Yes ❑ No DNA <br />❑ Yes ❑ No F]NA <br />❑ Yes ❑ No 0 NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: 30M�N <br />Test Start Time: 21 2°I 2146 <br />Initial Reading (Ri): '7.638" 1.080 <br />Test End Time: 2 ; 3:01 <br />Final Reading (RF): 87" -7.088. <br />Test Duration: I S 2 N w X <br />Change in Reading (RF-Ri): },Owl" }0002` <br />_ <br />Pass/Fail Threshold or Criteria: .007-,, <br />_ <br />Test Result: Pass 0 Fail <br />0 Pass 0 Fail <br />❑ Pass 0 Fail <br />❑ Pass 0 Fail <br />Was sensor removed for testing? fid' Yes ❑ No [INA <br />❑ Yes ❑ No DNA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No 0 NA <br />Was sensor properly replaced and Yes 0 No 0 NA <br />verified functional after testin ? <br />0 Yes 0 No 0 NA <br />0 Yes 0 No ❑ NA <br />0 Yes 0 No ❑ NA <br />C <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) — <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to as of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />