Laserfiche WebLink
E <br />Ll <br />SWRCB. January 2002 Page of <br />6. PIPING SUMP TESTING <br />Test Method Developed By: Q Sump Manufacturer Q Industry Standard Q Professional Engineer <br />0 Other (Spec) <br />Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br />Q Other (Spec) <br />Test Equipment Used: UST 2001 probes or Air Bellows gauging system <br />Equipment Resolution. 0.001 " / 0.005" <br />OEM <br />Niff*VA*g%hgm_w <br />Sump # 1 piping <br />Sump #2 transition <br />Sump # Sump # <br />Sump Diameter: <br />— 4 feet <br />20' <br />Sump Depth: <br />— 4 feet <br />— 3.5 feet <br />Sump Material: <br />Fiberglass <br />fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Clean <br />Clean <br />Portion of Sump Tested' <br />2" + product <br />2" + product <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />0 Yes 0 No <br />0 NA <br />0 Yes 0 No <br />0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />Q Yes 0 No <br />Q NA <br />0 Yes 0 No <br />0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />shutdown? <br />Was fail-safe verified to be <br />Q Yes Q No <br />0 NA <br />0 Yes 0 No <br />0 NA <br />0 Yes Q No 0 NA <br />Q Yes Q No Q NA <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting <br />30 mins <br />30 mins <br />test: <br />Test Start Time: <br />0 <br />0 <br />Initial Reading (RI): <br />14.381 <br />9.285 <br />Test End Time: <br />30 <br />30 <br />Final Reading (RF): <br />14.381 <br />9.285 <br />Test Duration: <br />30 mins <br />30 mins <br />Change in Reading (RF -RI): <br />0.0000 <br />0.000 <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Pass <br />Pass <br />® Pass 0 Fail <br />0 Pass 0 Fail <br />Was sensor removed for testing? <br />Q Yes 0 No <br />0 NA <br />Q Yes 0 No <br />Q NA <br />0 Yes Q No 0 NA <br />0 Yes Q No 0 NA <br />Was sensor properly replaced and <br />0 Yes Q No <br />0 NA <br />0 Yes 0 No <br />0 NA <br />Q Yes 0 No ONAT <br />Q Yes Q No Q NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to gAy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />