My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:09:15 PM
Creation date
6/3/2020 9:51:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ll <br />SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />v <br />Page of <br />Test Method Developed By: 0 Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br />0 Other (Spec) <br />Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic <br />0 Other (Spec) <br />Test Equipment Used: Mc Daniels / 3D test gauges — NIST Equipment Resolution: +/- 0.25% Is <br />Piping Run # 1 issue <br />Piping Run #2 reel Piping Run # <br />Piping Run # <br />Piping Material: Fiberglass <br />Fiberglass <br />Piping Manufacturer: AO Smith <br />AO Smith <br />Piping Diameter: 4" <br />4" <br />Length of Piping Run: 35 ` <br />25' <br />Product Stored: JP8 <br />JP8 <br />Method and location of <br />piping -run isolation: Sump <br />Sump <br />Wait time between applying <br />pressure/vacuum/water and 5 min <br />starting test: <br />5 min <br />Test Start Time: 0 <br />0 <br />Initial Reading (RI): 5.1 <br />5.1 <br />Test End Time: 60 <br />60 <br />Final Reading (RF): 5.1 <br />5.1 <br />Test Duration: 1 hour <br />I hour <br />Change in Reading (RF-Rj): 0.0 <br />0.0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: Pass <br />Pass ® Pass 0 Fail <br />0 Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Renlaced test boots on all ends <br />
The URL can be used to link to this page
Your browser does not support the video tag.