My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:09:15 PM
Creation date
6/3/2020 9:51:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page _ of <br />6. PIPING SUMP TESTING <br />Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard 0 Professional Engirtccr <br />0 Other (Specify) <br />Teat Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br />0 Other (Specify) <br />Test Eauipment Used: UST 2001 probes or Air Bellows gauging system Equipment Resolution: 0.001 0.005" <br />Comments — (include information on repairs made prior to lesfiyg, and recommended follow-up forfailed&,sts) <br />' if the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*)is "NO' or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />S; -d CEIBOLB9909 UTIS81 Nuel -4seo0 jealuso d00:60 60 91 ReW <br />SUMP # I piping <br />Sump #2 transition <br />Sump # <br />Sump # <br />Sump Diameter: <br />— 4 feet <br />2x3' <br />Sump Depth: <br />— 4 feet <br />— 3.5 feet <br />Sump Material: <br />Fiberglass <br />fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />i <br />Height from Tank Top to Lowest <br />Flectrical Penetration: <br />Condition of sump prior to tegting: <br />Clem <br />Clean <br />Portion of Sump Tested' <br />2" + product <br />2"+ product <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />OYes ONo DNA <br />OYes ONo DNA <br />0 Yes 0 No D NA <br />OYes 0 N DNA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?' <br />DYes ONo DNA <br />OYes ONo DNA <br />0 Yes 0 No D NA <br />DYes ONo DNA <br />Was fail-safe verified to be <br />operational?* <br />0 Yes 0 No 0 NA <br />D Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />30 wins <br />30 wins <br />Test Start Time: <br />0 <br />0 <br />Initial Reading (Ri): <br />14.381 <br />9.285 <br />Test End Time: <br />30 <br />30 <br />Final [leading (Ri,): <br />14.381 <br />9.285 <br />Test Duration: <br />30 wins <br />30 mins <br />Change in Reading (Ry -R,): <br />0.0000 <br />0.000 <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Pass <br />Pass <br />[]Pass 0 Fad <br />0 Pass (]Fail <br />Was sensor removed for testing? <br />0 Yes ONo ONA <br />0 Yew 0 No DNA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />0 Yes ONo DNA <br />0 Yes 0 No UNA <br />0 Yes 0 No DNA <br />0 Yes 0 No 0 NA <br />Comments — (include information on repairs made prior to lesfiyg, and recommended follow-up forfailed&,sts) <br />' if the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*)is "NO' or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />S; -d CEIBOLB9909 UTIS81 Nuel -4seo0 jealuso d00:60 60 91 ReW <br />
The URL can be used to link to this page
Your browser does not support the video tag.