My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:09:15 PM
Creation date
6/3/2020 9:51:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />11 <br />7. UNDER -DISPENSER <br />Test Method Developed BY: 0 UDC Manufacturer <br />n nih.— <br />E <br />Page _ of <br />AINMENT (UDC) TESTING <br />0 industry Standard 0 Profusions! L-nginc4.r <br />Test Method Used: <br />[I Pressure <br />0 Other 6Specifv <br />0 Vacuum <br />X Hydrostatic <br />Test Equipment Used: UST 2001 probes or Air Bellows gauging system <br />Equipment Resolution; 0.001 0.005" <br />TJDC # reel <br />UDC # <br />UDC # <br />UDC# <br />UDC Manufacturer: <br />UDC Material: <br />Fiberglass <br />TJDC Depth: <br />3.5 feet <br />Height from UDC Bottom to Top <br />of Highest Pi in Penetration <br />Height from UDC Bottom to <br />Lowest Electrical Penetration', <br />Condition of UDC prior to <br />�n* <br />Clean <br />_!e- <br />Portion of UDC Tested' <br />2" ± duct. <br />Does turbine shut down when <br />Ul)Csensor detects liquid (lx)th <br />product and water ?' <br />JYes DNo DNA <br />OYes GNo []NA <br />0 Yes <br />0 No DNA <br />0 Yes 0 No 0 NA <br />Turbine shutdown nM2nse time <br />Is system programmed for fail- <br />safe shutdown?* <br />3 yes 0 No 0 NA <br />0 yes 0 No 0 NA <br />0 Yes <br />0 No 0 N <br />0 Yes 0 No 0 NA <br />Was fail-safe verified to be <br />�tl()Dal? <br />0 Yes 0 No NA <br />0 Yes 0 No 0 NA <br />0 Yes <br />0 No 0 N <br />0 Yes 0 No 0 NA <br />_22� <br />Wait time between applying <br />pressure/Vacuum/water and <br />startip2 Ws <br />It <br />10 mins <br />Test Start Time: <br />0 <br />Initial Reading (R,)- <br />7.163 <br />Test End Time: <br />30 <br />Final Reading (RF): <br />7.163 <br />'rest Duration: <br />30 Mins <br />Change in Re9digg (RF-Rr): <br />0.000 <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />pass <br />Q Pass []Fail <br />[I Pass Q Fail <br />0 Pass []Fail <br />Was sensor removed for testing? <br />0 Yes 0 N DNA <br />oYes oNoONA <br />0 Yes <br />[] No 0 NA <br />0 Yes []No 0 NA <br />Way sensor properly replaced and <br />verified functional <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes <br />0 No 0 NA <br />0 Yes 0 No 0 NA <br />COMMentS — (include information on repairs made prior to testLp�iz, and recommended follow-up for failed tests) <br />1 If the entire depth of the 1JI)C is not tested, specify how much was tested. if the answer to ffivy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />9-d 6880L89S08 uilsel muej jseoo jej4us0 d10:60 ED ST Rew <br />
The URL can be used to link to this page
Your browser does not support the video tag.