Laserfiche WebLink
04/04/02 09:24 N0.681 1?07 <br />WpjTTEN MONITORING PROCEDURLES <br />UNDEpGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the /UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Name STOCKTON A.ASF <br />Facility Address 2000 STIM.SON ROAD, STOCKTON, CA 95206 <br />A. Describe the frequency of performing the monitoring: <br />Tank: Tank monitorinE is continuous leakage will roduce an alarm and generate a report. <br />Piping: Pi in is continuously monitored leakage will roduce an alarm and generate a report. <br />$, What methods and equipment, identified by name and model, will be used for performing and <br />monitoring: <br />Tank: Bath tanks have electrical float switches in their ,annular space and are wired to an <br />"Autostik" monitoring s stem <br />Piping: Underground i e leakage is detected by., float switches in both /pin sumps, These <br />switches are wired to the "Autostik" system. <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan should be <br />attached): <br />Monitorins is erformed at the fuel farm. Detected leaka`e roduees both audio and visual <br />alarms. <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring and/or <br />maintaining the equipment: <br />Gerardo Barajas•- Power equipment: repairer <br />Richard Gomez— P.O.L. Technician <br />E. Reporting format for monitoring: <br />Tante: Mon dy printed leak test <br />Piping: Mo ily rinted leak test <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: Maintenance <br />must be in accordance with the manufacturers' maintenance schedule but not less than every 12 <br />months. <br />G. Describe the training necessary for the operation of UST system, including piping and the <br />monitoring equipment: <br />Rt atorn are tined .zn._ fpm o ation,_ monitoring system. ., operation overfill protection <br />rocedures and etnergenc res onse tan 0 eration. <br />