Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Pape 4 of <br />VIII. MONITORING SYSTEM AND PROGRAMMING <br />i nes secvon must be completed if a monitoring pane/ is used to perform leak detection monitoring. <br />Y <br />N <br />NA <br />Are the visual and audible alarms operational? <br />® <br />❑ <br />❑ <br />Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, <br />functionally tested, and confirmed operational? <br />® <br />❑ <br />❑ <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />proper o eration? <br />® <br />❑ <br />❑ <br />Was monitoring system set-up reviewed to ensure proper settings? <br />® <br />❑ <br />❑ <br />Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? <br />® <br />❑ <br />[] <br />Does the flow of fuel stop at the dispenser if a leak is detected in the under -dispenser containment? <br />® <br />❑ <br />❑ <br />Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br />disconnected? <br />® <br />❑ <br />❑ <br />Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br />Which sensors initiate positive shut down? (Check all that apply.) ®Sump ®Under -dispenser containment <br />® <br />❑ <br />❑ <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />❑ <br />❑ <br />❑ <br />For any <br />answer of "N" above, describe in section IX how and when these deficiencies were or will be corrected. <br />' IX. COMMENTS <br />X. IN -TANK GAUGING TESTING <br />® Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br />❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) <br />This section must be com iefed if in -tank au in is used to erform leak detection monitorin . <br />Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ground <br />faults? <br />Were all in -tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, <br />and confirmed operational? <br />Y <br />❑ <br />❑ <br />N <br />❑ <br />❑ <br />NA <br />❑ <br />❑ <br />Was accuracy of system's product level readings tested? <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's water level readings tested? <br />❑ <br />❑ <br />❑ <br />Were all probes reinstalled properly? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Foran answer of "N" above, describe in section XI how and when these deficiencies were or wiU be corrected. <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Xi. COMMENTS <br />Y = Yes, N = No, NA =Not Applicable <br />