Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors {LLD) are NOT installed. (Do not complete this section.) <br />This section must be com lefed if LLDs are installed. <br />Was a leak simulated to verify LLD performance? <br />(Check all that apply.) Simulated leak rate verified: ®3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br />s) <br />Y <br />® <br />N <br />❑ <br />NA <br />❑ <br />Was the testing apparatus properly calibrated? <br />® <br />❑ <br />❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />❑ <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a Teak is detected? <br />® <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails <br />a test? <br />❑ <br />❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />® <br />❑ <br />❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />F,or any answer of "N"above, describe in section Xltl how and when these issues were or will be corrected. <br />® <br />❑ <br />❑ <br />XIII. COMMENTS <br />XIV. VACUUM 1 PRESSUREI HYDROSTATIC MONITORING EQUIPMENT TESTING <br />® Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used fo perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑Vacuum ❑Pressure ❑Hydrostatic <br />Sensor ID <br />Components) Monitored by this Sensor <br />Sensor Functionality <br />Test <br />Interstitial <br />Communication <br />Test <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />❑ Pass <br />❑Fail <br />❑Pass <br />❑Fail <br />How was interstitial communication verified? ❑Simulated leak at far ends of the interstitial space. <br />❑ Other (Describe the method in section XV below.) <br />❑Visual <br />❑Gauge <br />Inspection <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑Yes ❑ No (Describe the <br />reason <br />in section <br />XV below.) <br />For an <br />answer of "FAIL" above, describe in section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />GPH =Gallons per hour, Y = Yes, N = No, NA =Not applicable, VPH = Vacuum/PressurelHydrostatic, ID =Identification <br />