My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 2:28:01 PM
Creation date
6/3/2020 9:51:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231732
PE
2361 - UST FACILITY
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_2018.tif
Site Address
2000 STIMSON RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
le9onitoring System Certification <br />UST Monitoring Site Plan <br />site address: CA ARNG, 2000 Stimson RD, Stockton ----- <br />L-1 UST Annular 420 sensor . . <br />North . <br />L-2 UST STP 208 sensor L-5 Annular a <br />L-3 Reel UDC 208 sensor t q 10. <br />Probe <br />L-4 Trans Sump 208 sensor . . . . <br />L-5 AST Annular 420 sensor <br />L-4 Trans Sump <br />20K AS <br />Vaporless LD 3000 Underground product <br />. . . Line Leak Detector piping to AST <br />` E) <br />L-2 STP <br />Mt <br />15K US T <br />Probe 0-- L-3 Reel UDC in Aboveground piping <br />9 p 9 <br />Overspill _ _ Q Underground product <br />L-1 Annular 0y piping to loading reel <br />0--- Overfill Alarm <br />Veeder-Root <br />Date map �cas dra�,n: /� : L' <br />Instructions <br />E -Stop <br />If you already have a diagram that shows al! required information. you may inciude it; rather than this page, with your <br />Monitoring System Certification. On your site plan, show the �eneral layout of tanks and piping. Clearly identify <br />locations of the following equipment: if installed: monitoring system control panels- sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors, and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br />was prepared. <br />P <br />age � of <br />OS -00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.