Laserfiche WebLink
TjU6nitcring System Certification • <br />_y <br />Site Address: ; t; f � 0� ✓ "u' J�t�u NU00 DateoFTesting/Servicing: <br />F. In -Tank Gauging / SIR Equipment: C7'Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />1 ❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />" In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes <br />13No* <br />For equipment start-up or annual equipment certation, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: 0 3'g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />❑ Y <br />o* <br />Were all LLDs confirmed operational and accurate within regulatory requirements <br />Ef Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />ET—Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />F lectronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />3-1q/_A_� <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />_..For electronic LLDs, have all accessible wiring connections been visually inspected? <br />/A <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: )7-,(;? 7- 1; t-:<�.a !� �-a�f �t2,.�e�r.:e�' 41 ! Ir � ►� It SO ,�- � ,� <br />*P ✓ . <br />('L I U' f' 2 t'� f /.. T Fa G" l ! t? f3(- <k r '7 <br />�0{;5 1,V"P aPn6 f- of rSt Ife(j, . <br />Page 3 of 3 05/00 <br />