My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_1996-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:32:29 PM
Creation date
6/3/2020 9:52:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2006
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_1996-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREPARING THE SITE [cont'd]• <br />Step Four— Tank Sumps <br />Mount tank sumps to underground storage tanks (See <br />Tank Sump Instructions for detailed information). <br />Step Five— Dispenser Sumps <br />A) Mount dispenser sumps into <br />dispenser island forms (refer to <br />Dispenser Sump Instructions, <br />DSI830, for details). <br />Step Two— Secondary Fittings <br />Install bulkhead fittings, if applicable. For directions, <br />refer to the Bulkhead Fitting Instructions, BFI726, sup- <br />plied with the fittings. <br />Step Six <br />Make sure no backfill voids are <br />present. Allow backfill material <br />to be even with the bottom of the <br />bulkhead fitting or cuffed pen- <br />etration. Note: Avoiding direct <br />dumping of backfill will help to <br />eliminate sump distortion. <br />Before proceeding with this section, refer to page 6 for the proper <br />components that correspond to the type of secondary contain- <br />ment piping being installed. <br />TESTING THE SECONDARY PIPE <br />CLAMP: <br />1-2 FT LBS <br />a <br />CLAMP: <br />1-2 FT LBS <br />IIPIII!IIIIIIIII!I'�IIIiIhp�IlUll <br />A) Prior to testing the pipe <br />make sure each end is trimmed <br />squarely. Then attach any <br />inserts or stiffeners and the <br />bulkhead fittings to each end <br />of the secondary pipe. Then <br />torque the appropriate stainless <br />steel clamp 1 to 2 foot pounds. <br />B) Now, using the proper test <br />assemblies, apply 3 to 5 psi. <br />Hold the test for 15 minutes. If <br />pressure drops, soap test the <br />piping to determine the <br />problem. (TCI does not allow <br />any secondary pipe to be <br />repaired. If a problem is present, <br />discard that section of pipe.) <br />• <br />INSTALLING THE SECONDARY PIPE <br />Step One— Measuring and Cutting the Secondary Pipe <br />With all sumps in place, lay <br />secondary pipe in trench from <br />penetration to penetration; be <br />careful to follow proposed <br />contour of pipe in trench. Add <br />1' of pipe as safety factor. Cut <br />pipe with appropriate tool to <br />insure an even cut. Lay cut <br />secondary pipe in trench before <br />making final cut. <br />Step Two— Laying Piping Runs <br />Make sure pipe runs are cen- <br />tered in trench and laying side <br />by side (at least 411 apart). Main- <br />tain minimum clearance of 6" <br />from trench sides. Check slope. <br />If secondary pipe must be <br />crossed, allow minimum clear- <br />ance of 4" between pipes. <br />Step Three— Inserting Stiffener and Inspecting Secondary Pipe <br />SnFFENER <br />SECONDARY PIPE <br />Step Four— Sealing Pipe <br />Page 2 - Enviroflex Instructions <br />If using SP4500, insert stiffener <br />(CS3939) in secondary pipe. <br />Stiffeners are shipped with <br />Enviroflex bulkhead fittings <br />(FB/CB3950) and Enviroflex <br />compression seals (EF5039). In- <br />spect inside of cuff or bulkhead <br />and remove any sand or dirt. <br />Make certain there is no gravel <br />trapped inside secondary pipe. <br />If using SP4500, insert second- <br />ary pipe into bulkhead fitting <br />or compression seal so rib of <br />seal locks into first corrugation <br />valley on pipe. If using VP2501, <br />insert the pipe into the bulk- <br />head until the end of the pipe <br />extends slightly past the middle <br />band clamp. Torque secondary <br />clamp 1 to 2 foot pounds to <br />obtain seal on secondary pipe. <br />7 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.