My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_1996-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:32:29 PM
Creation date
6/3/2020 9:52:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2006
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_1996-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />ENVIROFLFX ° <br />Flexible Double -Wall Piping System <br />Installation is easier and faster than conventional <br />FRP and Steel resulting in reduced cost. <br />G <br />A <br />L <br />L <br />O <br />N <br />S <br />M <br />I <br />N <br />U <br />T <br />E <br />SIX NOZZLES FLOWING SIMULTANEOUSLY <br />2 <br />1 <br />O <br />3 2 1 6 5 4 <br />MPD NUMBER AS POSITIONED <br />=2" FRP =ENVIROFLEX <br />AVG. FLOW AT NOZZLE: ENVIROFLEX: 7.6, FRP: 7.9, %DIFFERENCE: 3.8 <br />Flow Rates are within 4% of 2" FRP. <br />Features <br />❑ No underground joints. All <br />connections secured inside <br />containment sumps <br />❑ 75% savings on installation <br />cost and time <br />❑ Both primary and secondary <br />are flexible <br />❑ Only certified contractor will be <br />allowed to install <br />❑ Primary manufactured and <br />tested by Dayco <br />❑ Du Pont virgin resin used to <br />construct primary <br />❑ Patented design <br />❑ Compatible with all fuels <br />Publication No.: EF400 <br />Effective Date: 3-01-91 <br />Supersedes: EF09905M <br />Benefits <br />❑ All joints are visible and <br />accessible from above ground; <br />reduced maintenance cost <br />❑ Quick installation allows more <br />immediate cash flow <br />❑ Neither primary or secondary <br />affected by ground movement <br />❑ Quality installation <br />❑ State-of-the-art thermoplastic <br />processing and testing <br />❑ Quality product with years of <br />engineering behind Enviroflex <br />❑ Assurance that all fuels can be <br />stored and transmitted well into <br />the 21st Century <br />❑ Complete system security <br />TEST STATION DIAGRAM <br />U <br />= FRP-260 L.F. = EnviroFlexO -240 L.F. <br />=TOTAL <br />CONTAINMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.