Laserfiche WebLink
M <br />SWRCB, January 2002 <br />Test Method Developed By: <br />Page a of <br />5. SECONDARY PIPE TESTING <br />ipmg Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />ressure ❑ Vacuum <br />❑ Other (Specify) <br />❑ Hydrostatic <br />Test Equipment Used: ?rp SSLqcc S 7 5 N t v Equipment Resolution: t -- I j P S <br />Piping III Run # Piping Run # ZPI III Run # l In Run # <br />W1,1111, P <br />Piping Material: d <br />Piping Manufacturer: <br />eye <br />Piping Diameter: <br />e <br />Length of Piping Run:yds <br />, `� (� <br />l '' YvK - I ao ` <br />to --K t r <br />Product Stored: <br />ulc� V <br />Su <br />i �Se <br />Method and location of <br />i in -run isolation: <br />;v • <br />T:�;b-� o-, ---x+- <br />eve t <br />t upe <br />Wait -t' a between applying <br />ure/ cuum/water and test: <br />s <br />, a u <br />k -0U -V Y <br />t u <br />Test Start Time: <br />1 v '. (U <br />q : J S <br />10 ; 0 S— <br />Initial Reading (RI): <br />P 5-.r <br />Test End Time: <br />t '. 1 v <br />l D '• S S <br />// �S" <br />Final Reading (RF): <br />t�5--` <br />5 /757 <br />y j% S --r <br />Test Duration: <br />t%e u p V, <br />ou k.- <br />-Change in Reading (RF -RI): <br />S <br />S$ <br />Pass/Fail Threshold or <br />Criteria: <br />tit Lo sS i v,. P 5:r- <br />00 Los i A PSS <br />P 6 tp S s F kl PSS <br />Test Result: ass ❑ Fail <br />Comments — (include information on repairs made <br />Vass ❑ Fail ass ❑ Fail ❑ Pass ❑ Fail <br />prior to testing, and recommended follow-up for failed tests) <br />