My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:40:58 PM
Creation date
6/3/2020 9:52:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />SWRCB, January 2002 <br />Test Method Developed By: <br />Page a of <br />5. SECONDARY PIPE TESTING <br />ipmg Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />ressure ❑ Vacuum <br />❑ Other (Specify) <br />❑ Hydrostatic <br />Test Equipment Used: ?rp SSLqcc S 7 5 N t v Equipment Resolution: t -- I j P S <br />Piping III Run # Piping Run # ZPI III Run # l In Run # <br />W1,1111, P <br />Piping Material: d <br />Piping Manufacturer: <br />eye <br />Piping Diameter: <br />e <br />Length of Piping Run:yds <br />, `� (� <br />l '' YvK - I ao ` <br />to --K t r <br />Product Stored: <br />ulc� V <br />Su <br />i �Se <br />Method and location of <br />i in -run isolation: <br />;v • <br />T:�;b-� o-, ---x+- <br />eve t <br />t upe <br />Wait -t' a between applying <br />ure/ cuum/water and test: <br />s <br />, a u <br />k -0U -V Y <br />t u <br />Test Start Time: <br />1 v '. (U <br />q : J S <br />10 ; 0 S— <br />Initial Reading (RI): <br />P 5-.r <br />Test End Time: <br />t '. 1 v <br />l D '• S S <br />// �S" <br />Final Reading (RF): <br />t�5--` <br />5 /757 <br />y j% S --r <br />Test Duration: <br />t%e u p V, <br />ou k.- <br />-Change in Reading (RF -RI): <br />S <br />S$ <br />Pass/Fail Threshold or <br />Criteria: <br />tit Lo sS i v,. P 5:r- <br />00 Los i A PSS <br />P 6 tp S s F kl PSS <br />Test Result: ass ❑ Fail <br />Comments — (include information on repairs made <br />Vass ❑ Fail ass ❑ Fail ❑ Pass ❑ Fail <br />prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.