Laserfiche WebLink
S WRCB, January 2002 Page q of <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard �ofessional Engineer <br />❑ Other (Sped) <br />Test Method Used: ❑ Pressure ❑ Vacuum `�iydrostatic <br />11 Other (Specify) // <br />Test Equipment Used: �c l� uJeL L c � <br />Sump #J Sump # Z <br />Equipment Resolution: , o d <br />Sump # ump # <br />Sump Diameter: q Z ` <br />L{ 2-1 <br />�Z <br />Sump Depth: ,fq r <br />� 2Z 11 <br />Y,3 i <br />Sump Material: t t 1 4 ss <br />i <br />F, l& -a S <br />Height from Tank Top to Top of <br />Highest Piping Penetration: Lb < <br />< L <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: v <br />Portion of Sump Tested' W -q -w lfj'� <br />,-_r LevaL L$'{ <br />Does turbine shut down when <br />sump sensor detects liquid (both KYes ❑ No ❑ NA <br />product and water ?4 <br />es ❑ No ❑ NAYes <br />❑ No ❑ NA <br />A \ <br />❑ Yes ❑ ❑ NA <br />Turbine shutdown response time C .,Llcec{, <br />tj'4-r- t, Lta-Is <br />3t1-$ Chat fCtc{ <br />system <br />shutdown?* programmed for fail-safe Ayes ❑ No ❑ NA <br />Kes ❑ No ❑ NA <br />es ❑ No ❑ NA <br />❑ Yes o ❑ NA <br />Was fail-safe verified to be <br />o erational?* ❑Yes „1 N0 ❑ NA <br />❑Yes o ❑ NA <br />❑Yes o ❑ NA <br />El Yes o ❑ NA <br />ing <br />Wait time betweerater <br />pressure/vacu d starting <br />test: IDl--1 1 kt.+-e 5 <br />(® r -d i ve s e- r S <br />Test Start Time: '1130 <br />16 <br />C11 yo <br />Initial Reading (RI): rC i 6 � Ctvct? <br />F. -V54 C� ke-00,1 <br />Fr v6 4' C fv&(0 <br />Test End Time: (D'- 00 <br />10 ' 5_0 <br />101. 10 <br />Final Reading (RF): i "v- C-ivda- <br />E6' 6l— <br />Test Duration: 3 o " v n+ -S <br />T-1 P , <br />Change in Reading (RF-R�: 0 o L <br />Ct <br />Pass/Fail Threshold or Criteria: a o 3" 3d r• ► o <br />r 0 e 5rd t <br />-s' 3' 0 - <br />Test Result Pass ❑Fair <br />ass Fail <br />Pass. 0 Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? gyes ❑ No ❑ NA <br />es DNo ❑ NA <br />es ❑ No ❑ NA <br />Yes ❑ No ❑NA <br />Was sensor properly replaced and'es ❑ No ❑ NA <br />verified functional after testing? <br />Yes ❑ No ❑ NA <br />des ❑ No DNA <br />❑Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />