My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
5611
>
2300 - Underground Storage Tank Program
>
PR0231764
>
COMPLIANCE INFO_2002-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2023 3:20:02 PM
Creation date
6/3/2020 9:52:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2010
RECORD_ID
PR0231764
PE
2361
FACILITY_ID
FA0002160
FACILITY_NAME
BlackHawk Petroleum Inc.
STREET_NUMBER
5611
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710052
CURRENT_STATUS
01
SITE_LOCATION
5611 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231764_5611 E WATERLOO_2002-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer 07ndustry Standard 0 Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: essure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> "TestEquipment Used:Nitrogen Equipment Resolution: psi <br /> Piping Run#87 Piping Run#91 Piping Run# Piping Runterial: FIBERGLASS FIBERGLASS <br /> nufactSMITH SMITH <br /> meter: 3" 3" <br /> Length of Piping Run: 200' 200' <br /> Product Stored: FUEL FUEL <br /> Method and location of BOOTED,SUMPS BOOTED,SUMPS <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1321 1323 <br /> Initial Reading(Rj): 3 psi 3psi <br /> Test End Time: 1421 1423 <br /> Final Reading(RF): 3psi 3psi <br /> Test Duration: 1 HR I HR <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: )Pass ❑Fail ePass 0 Fail ❑ Pass ❑Fail 0 Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.