Laserfiche WebLink
SWRCB,January 2002 0 0 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer FX Industry Standard Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: F-1 Pressure ❑ Vacuum Hydrostatic <br /> E] Other (Specify) <br /> Test Equipment Used: incon Equipment Resolution: +-.0020 <br /> Sump# 3 REG Sump# 3 REG Sump# 1 SUP Sump# 1 SUP <br /> Sump Diameter: 4811 4811 48" 4811 <br /> Sump Depth: 7411 7411 7211 7211 <br /> Sump Material: f iberg f iberg f iberg f iberg <br /> Height from Tank Top to Top of 911 911 911 9" <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 2511 25" 2511 25" <br /> Electrical Pentration: <br /> Condition of sump prior to testing: clean clean clean clean <br /> Portion of Sump Tested: 1 2"above 2"above 2 1'above 2"above <br /> Does turbine shut down when <br /> sump sensor detects liquid(both –]Yes❑N�N [:]Yes[7]N4— <br /> Yes❑NoON Yes❑No❑N <br /> product and water)?* <br /> Turbine shutdown response time: <br /> Is system programmed for fail-safe ❑ ❑ � ❑ ❑ ❑ ❑ � []Yes <br /> ❑ — T <br /> shutdown?* Yes N N Yes N N Yes N N Yes No <br /> Was fail-safe verified to be yes�No❑N —]Yes❑No�N OYes oNo❑N []Yes E]No�1 <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15min 15min 15min 15min <br /> test: <br /> Test Start Time: 1017 1032 1017 1032 <br /> Initial Reading(RI): 2.6750 2.6750 5.6847 5.6843 <br /> Test End Time: 1032 1047 1032 1047 <br /> Final Reading(RF): 2 .6749 2.6741 5.6835 5.6828 <br /> Test Duration: 15min 15min 15min 15min <br /> Change in Reading(R F-RI ): _ _0001 -.0009 -.0008 -.0015 <br /> Pass/Fail Threshold or Criteria: .0020 .0020 .0020 .0020 <br /> Was sensor removed for testing? aYes❑No❑NA X Yes�No❑NA�YesoNo❑NA Yes[]Not <br /> Was sensor properly replaced and �Yes]Nc�NA �Ye�N�NA �Yes❑Nc[7] Yes�No❑N <br /> verified functional after testing? <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to aDyof the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />