My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 4:44:22 PM
Creation date
6/3/2020 9:53:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2011
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2007-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X❑ Tank Manufacturer El Industry Standard Professional Engineer <br /> Other (Sped) <br /> Test Method Used: MPressure Vacuum F Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 1 SUP Piping Run# 3 REG Piping Run# Piping Run# <br /> Piping Material: FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: SMITH SMITH <br /> Piping Diameter: 3 IN 3 IN <br /> Length of Piping Run: 200 200 <br /> Product Stored: SUPREME REG UNLEAD <br /> Method and location of SUPREME REG UNLEAD <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time: 7:26 7:40 <br /> Initial Reading(Ri ): 3 PSI 3 PSI <br /> Test End Time: 8:26 8:40 <br /> Final Reading(RF ): 3 PSI 3 PSI <br /> Test Duration: 1 HR 1 HR <br /> Change in Reading(RF-I I ): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.