Laserfiche WebLink
SWRCB,January 2002 Page 3. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X❑ Tank Manufacturer El Industry Standard Professional Engineer <br /> Other (Sped) <br /> Test Method Used: MPressure Vacuum F Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 1 SUP Piping Run# 3 REG Piping Run# Piping Run# <br /> Piping Material: FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: SMITH SMITH <br /> Piping Diameter: 3 IN 3 IN <br /> Length of Piping Run: 200 200 <br /> Product Stored: SUPREME REG UNLEAD <br /> Method and location of SUPREME REG UNLEAD <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time: 7:26 7:40 <br /> Initial Reading(Ri ): 3 PSI 3 PSI <br /> Test End Time: 8:26 8:40 <br /> Final Reading(RF ): 3 PSI 3 PSI <br /> Test Duration: 1 HR 1 HR <br /> Change in Reading(RF-I I ): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />