Laserfiche WebLink
,SWRCB,January 2002 0 0 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard X❑ Professional Engineer <br /> Other (Sped) <br /> Test Method Used: 1-1Pressure ❑ Vacuum 1fl Hydrostatic <br /> El Other (Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: <br /> Sump# 1 SUP Sump# 3 REG Sump# Sump# <br /> Sump Diameter: 48 IN 48 IN <br /> Sump Depth: 6 FT 6 FT <br /> Sump Material: FIBERGLASS FIBERGLASS <br /> Height from Tank Top to Top of 18 IN 18 IN <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 3 FT 3 FT <br /> Electrical Pentration: <br /> Condition of sump prior to testing: GOOD GOOD <br /> Portion of Sump Tested: 1 20 IN 20 IN <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X jYes[_]No❑N EYes❑N�_]N ❑Yes❑No❑N [:]Yes❑No❑N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 SEC 2-5 SEC <br /> Is system programmed for fail-safeo ❑ � ❑ ❑ � ❑ ❑ � []Yes <br /> ❑ Lir <br /> shutdown?* Yes N N X Yes N N Yes N N Yes No <br /> Was fail-safe verified to be ❑ ❑ � ❑ ❑ � ❑ _]NA❑ ❑ �T <br /> operational?* R Yes N N X Yes N N X Yes N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 MIN 5 MIN <br /> test: <br /> Test Start Time: 7:35 8:18 <br /> Initial Reading(Rl): 7.881 6.315 <br /> Test End Time: 8:05 8:48 <br /> Final Reading(RF): 7.881 6.315 <br /> Test Duration: 30 MIN 30 MIN <br /> Change in Reading(R F-RI ): 0 0 <br /> Pass/Fail Threshold or Criteria: .05 GPH .05 GPH <br /> Was sensor removed for testing? X Yes N NA X Yes N NA Yes N NA Yes No <br /> Was sensor properly replaced and [j] � � 0 � � ❑ � � ❑ ❑ <br /> verified functional after testing? Ye N NA Ye N NA Ye N NA Yes N <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />