Laserfiche WebLink
SWRCBS January 2002 Page 6. <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer Industry Standard ❑X Professional Engineer <br /> Other (Specify) <br /> Test Method Used: ❑ Pressure Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: <br /> 1 M UDC# 9/10 UDC# 11/12 UDC# UDC# <br /> UDC Manufacturer: CS CS <br /> UDC Material: FIBERGLASS FIBERGLASS <br /> UDC Depth: 28 IN 28 IN <br /> Height from UDC Top to Top of 8 IN 8 IN <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 2 IN 2 IN <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: GOOD GOOD <br /> Portion of UDC Tested: 1 10 IN 10 IN <br /> Does turbine shut down when <br /> sump sensor detects liquid(both .71 �No�N EYes❑No❑N ❑Yes[7]No[7]NA❑Yes[]No�l <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 SEC 2-5 SEC <br /> Is system programmed for fail-safe ❑ ❑ ❑ ❑ ❑ F] <br /> shutdown?* Yes N N X Yes N N Yes N N Yes No <br /> Was fail-safe verified to be ❑ ❑ ❑ ❑ o ❑ ❑ ❑ [T <br /> operational?* X Yes N N X Yes N N X Yes N N Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 MIN 5 MIN <br /> test: <br /> Test Start Time: 9:52 9:55 <br /> Initial Reading(Ri): 11.496 4.038 <br /> Test End Time: 10:07 10:10 <br /> Final Reading(RF): 11.496 4.038 <br /> Test Duration: 15 MIN 15 min <br /> Change in Reading(RF-Ri ): 0 0 <br /> Pass/Fail Threshold or Criteria: .05 GPH .05 gph <br /> Was sensor removed for testing? X Yes N NA X Yes N NA Yes N NA Yes NoaA <br /> Was sensor properly replaced and � � 0 � � ❑ � ❑ �T <br /> verified functional after testing? Ye N NA Ye N NA Ye N NA Yes N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> i If the entire depth of the UDC is not tested,specify how much was tested.If the answer to-any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />