Laserfiche WebLink
SWRCB;January 2002 0 0 Page 5. <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: F-1 UDC Manufacturer F-1 Industry Standard ❑X Professional Engineer <br /> Other (Sped) <br /> Test Method Used: F] Pressure ❑ Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: <br /> UDC# 1/2 UDC# 3/4 UDC# 5/6 UDC# 7/8 <br /> UDC Manufacturer: CS CS CS CS <br /> UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS <br /> UDC Depth: 28 IN 28 IN 28 IN 28 IN <br /> Height from UDC Top to Top of 8 IN 8 IN 8 IN 8 IN <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 2 IN 2 IN 2 IN 2 IN <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: GOOD GOOD GOOD GOOD <br /> Portion of UDC Tested: 1 10 IN 10 IN 10 IN 10 IN <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X❑Yes❑No�N Yes�Na❑N MYes❑NoON --'Yes❑NoDVV <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 SEC 2-5 SEC 2-5 SEC 2-5 SEC <br /> Is system programmed for fail-safe ❑ ❑ � ❑ ❑ [j]Yes <br /> � ❑ �V <br /> shutdown?* X Yes N N X Yes N N X Yes N N X Yes No <br /> Was fail-safe verified to be ❑ � ❑ � ❑ ❑ � ❑ ❑ <br /> operational?* X Yes N N [j]Yes N N X Yes N N X Yes NoLSV <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 MIN 5 MIN 5 MIN 5 MIN <br /> test: <br /> Test Start Time: 10:58 11:00 10:20 10:26 <br /> Initial Reading(Rl): 2.886 3.227 1.194 10.209 <br /> Test End Time: 11:13 11:15 10:35 10:41 <br /> Final Reading(RF): 2.886 3.227 1.194 10.209 <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Change in Reading(RF-RI ): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .05 GPH .05 GPH .05 GPH .05 GPH <br /> MEN= <br /> Was sensor removed for testing? X Yes N NA X Yes N NA X Yes N NA'--'Yes No <br /> Was sensor properly replaced and Ye�N ❑ eso NNA X❑YesNo[:]� <br /> verified functional after testing? X Ye NNA ❑ Y <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to-any of the questions indicated with an <br /> asterisk(*)is "NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />