My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 4:44:22 PM
Creation date
6/3/2020 9:53:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2011
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2007-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB;January 2002 0 0 Page 5. <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: F-1 UDC Manufacturer F-1 Industry Standard ❑X Professional Engineer <br /> Other (Sped) <br /> Test Method Used: F] Pressure ❑ Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: <br /> UDC# 1/2 UDC# 3/4 UDC# 5/6 UDC# 7/8 <br /> UDC Manufacturer: CS CS CS CS <br /> UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS <br /> UDC Depth: 28 IN 28 IN 28 IN 28 IN <br /> Height from UDC Top to Top of 8 IN 8 IN 8 IN 8 IN <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 2 IN 2 IN 2 IN 2 IN <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: GOOD GOOD GOOD GOOD <br /> Portion of UDC Tested: 1 10 IN 10 IN 10 IN 10 IN <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X❑Yes❑No�N Yes�Na❑N MYes❑NoON --'Yes❑NoDVV <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 SEC 2-5 SEC 2-5 SEC 2-5 SEC <br /> Is system programmed for fail-safe ❑ ❑ � ❑ ❑ [j]Yes <br /> � ❑ �V <br /> shutdown?* X Yes N N X Yes N N X Yes N N X Yes No <br /> Was fail-safe verified to be ❑ � ❑ � ❑ ❑ � ❑ ❑ <br /> operational?* X Yes N N [j]Yes N N X Yes N N X Yes NoLSV <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 MIN 5 MIN 5 MIN 5 MIN <br /> test: <br /> Test Start Time: 10:58 11:00 10:20 10:26 <br /> Initial Reading(Rl): 2.886 3.227 1.194 10.209 <br /> Test End Time: 11:13 11:15 10:35 10:41 <br /> Final Reading(RF): 2.886 3.227 1.194 10.209 <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Change in Reading(RF-RI ): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .05 GPH .05 GPH .05 GPH .05 GPH <br /> MEN= <br /> Was sensor removed for testing? X Yes N NA X Yes N NA X Yes N NA'--'Yes No <br /> Was sensor properly replaced and Ye�N ❑ eso NNA X❑YesNo[:]� <br /> verified functional after testing? X Ye NNA ❑ Y <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to-any of the questions indicated with an <br /> asterisk(*)is "NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.