Laserfiche WebLink
Aug. 28. 2014 10: 14AM No. 4580 P. 5 <br /> Page 6 of 26 <br /> 5. SECONDARY PIPE TESMG <br /> Test Method Developed By: Q Piping Manufacturer Industry Standard n Professional Engineer <br /> 0 Other(Spmi)J) <br /> Test Method Used: 0 Pressure ❑vacuum C hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: See attached tating procedures Equipment Resolution: <br /> Piping Ran# Tp Piping Ran Piping Run# Piping Run# <br /> Piping Material: <br /> Piping <br /> Piping Manufacturer: <br /> F-i <br /> Piping Piping Diameter: <br /> Length of Piping Run: da.,f-k zge-, ZVO <br /> Product Stored: r 7 <br /> Method and location of <br /> M 2)in g-::ru RD.!i SE 02 11 ant i 20 n: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Reading(ki): S psi 'Psi psi psi <br /> Test End Time: 9 15 <br /> Final Reading(A*): psi 10—d psi psi <br /> Test Duration: 1 hour I hour I hour I hour <br /> Change in Reading(RF-n; 0 -0 <br /> Pass/Fail Threshold or 0100 0.00 0.00 0.00 <br /> Criteria: <br /> Comments-(Include information on repairs made prior to testa,and recommendedfollow-upforfaded tests) <br /> '"WEEME W WOMMOMW <br /> AUG 2 8 <br /> 2014 <br /> HFAIT-m nie vmmm <br />