Laserfiche WebLink
Aug. 28. 2014 10: 14AM No. 4580 P. 6 <br /> Page 7 of 14 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed]By: D Sump Manufacturer IDdusty Standard ❑Professional Engineer <br /> El Other(Sindfy) <br /> Test Method Used: El Pressure. 0 vacuum Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Sump N zz SUMP# SUMP# SUMP# <br /> Sump Diameter. <br /> Sump Depth: 77 <br /> Sump Material&Manufacturer: <br /> Height from Tank Top to Top of U U <br /> j Z- <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 77 <br /> Condition of sump prior to testing: V K <br /> Above highest Above highest Above highest above highest <br /> portion:of Sump Tested' penetration 0anetration penetration paneirslion <br /> St <br /> DoesJur f: <br /> turbine shut down when <br /> sump sensor detects liquid(both F1 Yes El No ED NA ®Yes D No 0 NA DYes D No N NA El Yes D No Z NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe 0Yes®No®NA FlYes[]NO®NA ElyesrNo[DNA [:]Yes Lj No 0 NA <br /> shutdown?* <br /> Was fail-safe verified to be Flyes nNo®NA Elyes r-1 No[K NA Elyes 0 No 0 NA El Yes[j No JR NA <br /> 2perixtional?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test'. <br /> Test Start Time: 47 <br /> Initial Reading(Rj): 13 5 Q. 74'r3 <br /> Test End Time: 14p,-e <br /> Final Reading(RF): 74 1 ?, <br /> Test Duration: is min 15 min 15 min 15 min <br /> Change in Reading(RF-Ri): ORD OdPOP ? <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> FF] pigs Pass. - <br /> Test"Res,U16, ETRA Q-1 Fag, El �h0s ' ❑k. <br /> Was sensor removed for testing? El Yes[:]No❑NA nyes El No El NA Elyes El No[—]NA [:1 Yes[I No[I NA <br /> testing? <br /> El <br /> Was sensor properly replaced and Yes El No ED NA []Yes n NonNA DYes n No El NA [71 Yes El No[71 NA <br /> p verified functional after testis A. <br /> Comments—Lnclude ire orntat%ora ora gay airs made riot to testier ,orad reCOmma?Prded allow u ow ailed tests <br /> 0 111110001%WLE101 V "D <br /> Al IG 2 8 2014 <br /> NMENTAL <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />