Laserfiche WebLink
,aTanknology <br /> t. <br /> Emergency Stop (E-Stop / ESO) Periodic Inspect* <br /> f � s > � <br /> Site#:CHEVRON#99840 99840 Date:1/9/2014 <br /> Address:4344 E WATERLOO RD @ 99 Name:Jarrod Cooke <br /> City/State:STOCKTON CA <br /> Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> IN <br /> 1 Number of E-Stop switches INSIDE of the building: 1 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 1 <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram r+' r r <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS ro r 9 <br /> 5 Do all E-Stops shutdown power to ALL STP's re r r <br /> 6 Are ALL E-Stops clearly Labeled le r r <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled ro r r <br /> PovTT1S€ <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. to r r <br /> 9 All safety barricades and test equipment has been properly removed C+" r r <br /> 10 E-Stop was reset and all dispensing functions are normal s+ r r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL INCONCLUSIVE <br /> mtteat `descr€tom aftyteficaen€ s#cutct) <br /> WO:2314890 <br />