Laserfiche WebLink
• _ r <br />f <br />PUBLIC HEALTH SERVICES <br />Pp• U l /y <br />SAN JOAQUIN COUNTY <br />JOGI KHANNA M.D., M.P.H. d <br />Health Officer <br />P.O. Box 2009 • (1601 East Hazelton Avenue) • Stockton, California 95201 94FOµa <br />(209)468-3400 <br />�r(lt, 'fe1i `ew Al, z5_1m <br />TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br />San Joaquin County Public Health Services Environmental Health Division has <br />established the following guidelines to assist you in the completion of <br />your construction project. The guidelines specify the construction and <br />monitoring details needed to complete our review of your underground <br />storage tank system. <br />1. SUBMITTAL OF PLANS <br />a. Submit 4 complete sets of detailed drawings to the Environmental <br />Health Division. One set will be retained by the department. <br />b. Include equipment specification sheets and manufacturer's <br />brochures describing operating and monitoring systems. <br />C. Include detailed monitoring and response plans. <br />2. PLAN REVIEW AND OPERATING PERMIT FEES <br />a. New facility plan review fee of $30.00 and operating permit <br />application fee of $150.00 plus $50.00 per additional tank is due <br />at time of plan submittal plus $56.00 per tank State surcharge. <br />b. New installation of additional tank at existing facility is <br />$30.00 plan review plus $50.00 per new tank permit fee plus State <br />surcharge. <br />3. PLAN REVIEW GUIDELINES <br />a. The enclosed plan review sheet is provided for your information <br />to assist you in interpreting our requirements for new tank <br />systems. <br />b. A letter will be sent to you in the event deficiencies are found <br />in the tank plans. <br />C. A copy of the California Underground Storage Tank Regulations can <br />be obtained from the State Water Resources Control Board <br />(916) 324-1262 or from this office for a handling fee of $2.00. <br />d. Please check with the San Joaquin County Air Pollution Control <br />District, Building Department and Fire District for their <br />requirements. <br />e. Submittal of new tank plans to this agency satisfies tank <br />registration requirements.for the State of California. <br />f. Please allow five (5) to fifteen (15) working days for plan <br />review. <br />g. Field inspections associated with the plan review process should <br />be arranged twenty-four (24) hours in advance. <br />h. A total of three (3) inspections will be made of the tank system <br />being installed according to the enclosed inspection record. <br />i. complete and submit an application to operate underground storage <br />tank(s). <br />A Division of San Joaquin County f Icalth Care Services 0 <br />