My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:59:43 PM
Creation date
6/3/2020 9:53:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROUTINE MONITORING PROCEDURES <br /> Section 2632(d)(1)Title 23 CCR,Chapter 16 <br /> UNDERGROUND FUEL STORAGE TANK <br /> Facility Name: SBC (LODICA01 UE020) <br /> Facility Address: 124 W. ELM STREET LODI <br /> Telephone: 209-334-0010 <br /> Tank Owner Name: SBC <br /> Tank Owner Address: 2600 Camino Ramon Room 3E000 San Ramon CA 94583 <br /> Telephone: (866)492-6836 <br /> SBC Tank ID# 795 <br /> UST Installed: 8,000 -gallon double wall composite tank Containing Diesel Fuel for the <br /> Emergency Generator. <br /> Piping Installed: Double Wall "Western Fiberglass, Co-Flow System" non-metallic flexible <br /> piping system for the product supply and return lines. The aboveground piping is single wall <br /> welded steel. <br /> A. The Frequency of Performing the Monitoring: <br /> Monitoring is performed continuously on the: <br /> • Double wall UST Interstitial space and its two sumps. <br /> • Monthly inspections of the TLS panel will be performed by SBC personnel to ensure <br /> proper operation. <br /> • Monthly inspections of the aboveground fuel piping will be performed by SBC personnel <br /> to ensure proper operation. <br /> • Enhanced Leak Detection(ELD) testing will be performed to ensure the system integrity. <br /> ELD will be performed thereafter every three years, not to exceed 36 months from <br /> the initial test. <br /> B. The methods and equipment used to perform continuous monitoring are: <br /> • VEEDER ROOT Fuel Tank Monitoring System Model # TLS-350 with CSLD <br /> • Internal site-fax modem with printer <br /> • 0.1 GPH magnetostrictive in-tank volumetric probe Model# 847390-107 <br /> • Floating liquid sensors in the: <br /> 1. UST Interstitial space sensor Model# 794390-420 <br /> 2. Piping sump sensor Model# 794380-352 <br /> 3. Fill sump sensor Model# 794380-352 <br /> 4. Generator room sensor Model # 794380-420 <br /> • Electronic Tank Overfill Alarm Model # 790091-001 <br /> lAHAZMAT\PACBELL\FORMS\SBC Monitor Plan Merge.doc <br /> Printed:August 10,2005 page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.