Laserfiche WebLink
C. Locations where monitoring is performed: (see the plot plan for physical location) <br /> Continuous monitoring and leak detection are performed: <br /> • In the interstitial space of the double wall UST <br /> • In the primary tank(by volumetric test) <br /> • In the piping sump <br /> • In the fill sump <br /> • Generator room. sensor <br /> D. 1. The Site Manager, Tom Williams at 209-578-7178 is responsible for performing: <br /> • Operational monitoring <br /> • On site record keeping,Note: Onsite records are maintained on a white board mounted in <br /> the facility. And label "Facility Information Center" and contains the UST Routine <br /> Monitoring &Response Plan,Hazardous Material Business Plan and other <br /> environmental records and permits. <br /> • The reporting of any discrepancies and alarms with the monitoring system, UST,piping, <br /> and associated hardware. <br /> 2. SBC - Environmental Management Control Center(EMCC) (California&Nevada region) <br /> at(866) 492-6836 is responsible for all maintenance and repairs to the UST monitoring <br /> system, UST, piping, and all associated hardware. <br /> E. Reporting format: <br /> • A site fax modem with auto-dial for up to 8 phone numbers is installed to fax alarms <br /> and warnings 24 hours a day to SBC - Environmental Management Control Center <br /> (EMCC) for alarms received by the TLS-350s. All on-site alarm are printed by the <br /> TLS-350 and maintained on site in the UST record box. <br /> • SBC - Environmental Management Control Center uses computers with Internal <br /> Environmental Management software program for accessing/polling all facilities <br /> with Veeder Root TLS-350's daily, 7 days a week; for all: (1) inventory, (2) all <br /> alarms, (3) all warnings, (4) in tank leak detection, and(5) all sensors leak alarms, <br /> performing set up and programming changes, and system diagnostics with all data <br /> being stored in our database. <br /> • SBC will response to all alarms in a timely manner. <br /> lAHAZMAT\PACBELUFORMS\.SBC Monitor Plan Merge.doc <br /> Printed:August 10,2005 page 3 <br />