My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 6 <br /> SITE HEALTH AND SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE INF RMAT N EVALUATION OF POTENTIAL HAZARDS <br /> 1. Site Name: i 1. Chemicals Hazards <br /> Address: vy\ [�J Carcinogens: l - <br /> Contact Person: F Phone No: ❑Corrosives: <br /> Sweeps Number: Dusts: <br /> Proposed Date of investigation/inspection: �8® <br /> ❑Explosives: <br /> Flammables• <br /> 2. Description and brief narrative of inspection activity: ❑Inorganic Gases: <br /> ❑New UST installation. ❑UAR Investigation. ❑Meds: <br /> ❑Tank Closure in Place. ❑Tank/Pipe Repair. ❑Oxidizers: <br /> ❑Tank/Pipe Removal. ❑Re-excavation. ❑PCB's: <br /> ❑Installation of Borings/Monitoring Wells. <br /> tp <br /> '' PART III <br /> 3. Speci is Site ti <br /> Informao : <br /> Tank No.: Tank Capacity: REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br /> Tank Content: Tank Age: 1. Monitoring Equipment(note:Monitoring instruments must be used for all <br /> operations unless appropriate rationale of restrictions are provided) <br /> Other: <br /> ❑Combustible Gas/Oxygen Meter. <br /> 4. Type of Operation: ❑Detector Tubes Specify). <br /> ❑Photo ionization Detector. <br /> 5. Release History: ❑Organic Vapor Analyzer. <br /> Evidence of leaks/soil contamination: F-1YES ❑NO [I Other,specify. <br /> Documented Groundwater contamination: <br /> ❑YES ❑NO if monitoring instruments are not used,rationale or activity/area restrictions: <br /> Background and description of any previous investigation or incidence: <br /> 2. Personal Protective Equipment <br /> 6. Potential Health and Safety Level of Protection: ❑A ❑B ❑C D <br /> Physical Concerns:(check all that apply&describe) J�PHard Hat. <br /> ❑Hear or Cold Stress: °F(high ambient temp.) Safety Glasses/goggles. <br /> Steel toed/shank shoes or boots. <br /> El Noise Sources: <br /> ElFlame retardant coveralls. <br /> ❑Oxygen Deficiency: <br /> E]Excavation:(falls,trips,slipping,cave-ins): ®Hearing protection. <br /> ❑Tyvek. <br /> ❑Handling and Transfer of a Hazardous Substance:(fire,explosions, <br /> El ❑APR ❑SCBA <br /> etc ): <br /> ❑Confined space entry:(explosions): A/P cartridge: <br /> ❑Heavy equipment(physical injury&trauma resulting from moving ®Safety vest. <br /> equipment): ❑Two-way communication. <br /> ❑Other,specify <br /> PART IV-PLAN APPROVAL <br /> 7. Anticipated Biological Hazards: <br /> El Snakes ❑hisects ❑Rodents ❑Poisonous Plants Plan Prepared by: git!s Date: (,d6 <br /> ❑Other/Unknown(specify): <br /> Plan Approved by: Date: <br /> 8. Narrative(provide all information which could impact Health and Safety, <br /> e.g.,power lines,integrity of dikes,ten-din,etc.) <br /> EH 23081(12/17/2002) <br />
The URL can be used to link to this page
Your browser does not support the video tag.