Laserfiche WebLink
i , r <br /> Monitoring System Certification <br /> Address: 124 W.ELM ST. LODI 95242 Service Dater 12/04/2009 <br /> F. In-Tank Gauging/SIR Equipment ®Check this box if tank gauging is used only for inventory control <br /> ❑Check this box if no tank gauging or SIR Equipment is installed <br /> This section must be completed if In-tank gauging equipment is used to perform teak detection monitoring <br /> Complete the fol lowin checklist <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground <br /> faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑No, Were all probes reinstalled properly? <br /> ❑Yes ❑No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> "In the Section H below,describe how and when these deflclencies were or will be corrected <br /> G. Line Leak Detectors(LLD): 19 Check this box if LLDs are not installed <br /> Complete the fo owing checklist <br /> ❑Yes ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD <br /> performance? <br /> ❑N/A Simulated Leak Rate(check all that apply) ❑3.0 g.p.h ❑0.1 g.p.h ❑0.2 g.p.h <br /> ❑Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is <br /> disabled or disconnected? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system <br /> malfunctions or falls a test? <br /> ❑N/A <br /> (l Yes ❑No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ❑Yes ❑No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H below,describe how and when these deficiencies were or will be corrected <br /> H. Comments <br /> Suction system. <br /> Monitoring System Certification Page 3 of 4 12/07 <br /> 3 2121/07 <br />