Laserfiche WebLink
Monitoring System Certification <br /> Address: 124 W. ELM ST.LODI 95242 Service Date: 12/04/2009 <br /> UST monitoring Site Plan <br /> . . . . . . . . . . . . . . . . <br /> fiEti fws 7olr . . . . . . . . . . ! �j <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . <br /> . ,,,.. . . . . . . . . . . . <br /> r., <br /> . . . . . . . . . . _ <br /> Y ♦- <br /> _ . . . . .i <br /> . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn: 12/04/2009 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification.On your site plan,show the general layout of tanks and piping. <br /> Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors <br /> monitoring tank annular spaces, sumps,dispenser pans,spill containers, or other secondary containment <br /> areas; mechanical or electronic line leak detectors;and in-tank liquid level probes(if used for leak detection). <br /> In the space provided, note the date this Site Plan was inspected. <br /> Monitoring System Certification Page 4 of 4 12/07 <br /> 4 2/21/07 <br />