My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'SWRCB,January 2002 Page 2 of 5 <br /> 4.TANK ANNULAR TESTING <br /> Test Method Developed by ❑ Tank Manufacturer N Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used ❑ Pressure N Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used:4"Dial Guage Equipment Resolution: .2 <br /> Tank##UE020U001 Tank# Tank# Tank# <br /> Is Tank Exempt From Testing?(1) ❑ Yes N No ❑ Yes ❑No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Tank Capacity: 8,000 Gallons <br /> Tank Material: Steel/Fiberglass <br /> Tank Manufacturer: Modern Welding <br /> Product Stored: Diesel <br /> Wait Time between applying One Hour <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 10:05 AM <br /> Initial Reading(Ri): -10 HG <br /> Test End Time. 11:05 AM <br /> Final Reading(Rf): -10 HG <br /> Test Duration: One Hour <br /> Change in Reading(Rf-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 0 <br /> Test Result N Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Was Sensor Removed for Testing? N Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> Was Sensor properly replaced and ❑ Yes N No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> verified functional after testing? <br /> Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br /> Re-Installed Sensor To Lowest Point But Not Tested. <br /> (1)Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as <br /> sysrtems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. {California Code of <br /> Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.