Laserfiche WebLink
"SWRCB,January 2002 Page 3 of 5 <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed by ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used:4"Dial Gauge Equipment Resolution: .l <br /> Piping Run#Spy/Rn Piping Run#Vent Piping Run# Piping Run# <br /> #UE020U001 #UE020U001 <br /> Piping Material: Plastic Fiberglass <br /> Piping Manufacturer: Total Containment A.O. Smith <br /> Piping Diameter: 4" 3" <br /> Length of Piping Run: Approx.40' Approx. 35' <br /> Product Stored: Diesel Diesel <br /> Method and location of piping-run Test Boot In Pipe Test Port @ Vent <br /> isolation: Sump Riser <br /> Wait Time between applying 15 Minutes 15 Minutes <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 9:35 AM 9:45 AM <br /> Initial Reading(Ri): 5 PSI 5 PSI <br /> Test End Time: 10:35 AM 10:45 AM <br /> Final Reading(Rf): 5 PSI 2.0 PSI <br /> Test Duration: One Hour One Hour <br /> Change in Reading(Rf-Ri): 0 3 PSI <br /> Pass/Fail Threshold or Criteria: 0 0 <br /> Test Result ® Pass ❑ Fail ❑ Pass ® Fail ❑ Pass ElFail ElPass ElFail <br /> Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br /> Vent Secondary Line Has A Steady Drop,Could Not Pin Point Problem,No Signs Of Leakage At Pipe Ends. <br /> Supply And Return Share The Same Secondary Line(Passed). <br />