Laserfiche WebLink
Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />The Diesel Spill Bucket passed the hydrostatic test. No repairs are needed at present time. <br />SWRCB, January 2002 <br />Page _6_ of --6- <br />8. SPILL/OVERFILL CONT NT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />® Industry Standard ❑ Professional Engineerr <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: VISUAL/MEASURE <br />Equipment Resolution: <br />Spill Box #FILL Spill Boz # <br />Spill Box # Spill Bow # <br />Bucket Diameter: <br />11" <br />Bucket Depth: <br />10" <br />Wait time between applying <br />pressure/vacuum/water and <br />30 MINUTES <br />starting test: <br />Test Start Time: <br />9:40 <br />Initial Reading (R): <br />6" <br />Test End Time: <br />10:40 <br />Final Reading (RF): <br />6" <br />Test Duration: <br />1 HOUR <br />Change in Reading (RF -RI): <br />0" <br />Pass/Fail Threshold or <br />019 <br />Criteria: <br />Test Result: <br />® Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass ❑Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />The Diesel Spill Bucket passed the hydrostatic test. No repairs are needed at present time. <br />