My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />The Diesel Spill Bucket passed the hydrostatic test. No repairs are needed at present time. <br />SWRCB, January 2002 <br />Page _6_ of --6- <br />8. SPILL/OVERFILL CONT NT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />® Industry Standard ❑ Professional Engineerr <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: VISUAL/MEASURE <br />Equipment Resolution: <br />Spill Box #FILL Spill Boz # <br />Spill Box # Spill Bow # <br />Bucket Diameter: <br />11" <br />Bucket Depth: <br />10" <br />Wait time between applying <br />pressure/vacuum/water and <br />30 MINUTES <br />starting test: <br />Test Start Time: <br />9:40 <br />Initial Reading (R): <br />6" <br />Test End Time: <br />10:40 <br />Final Reading (RF): <br />6" <br />Test Duration: <br />1 HOUR <br />Change in Reading (RF -RI): <br />0" <br />Pass/Fail Threshold or <br />019 <br />Criteria: <br />Test Result: <br />® Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass ❑Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />The Diesel Spill Bucket passed the hydrostatic test. No repairs are needed at present time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.