My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEALTH & SAFETY 0 0 2007 <br /> 4.0 EXCAVATION TO TOP OF UST'S <br /> The removal of above-ground structures, equipment, and surface materials related to the UST <br /> conversion will be performed in Compliance with all State and Local Regulations. <br /> Appropriate action will be taken to avoid the spread of dust to occupied portions of the surrounding <br /> area. Water will be used for dust control in such a manner as to not result in a hazardous or <br /> objectionable condition. Compliance will be in accordance with the Air Pollution Control District <br /> governing this area. <br /> At this site with tank bury exceeding 5 feet, we will slope and bench excavation with accordance to <br /> OSHA regulations. <br /> During excavation to the top of the UST's, it is anticipated that no persons will enter an open <br /> excavation. If it is deemed necessary, appropriate measures will be taken to protect personnel when <br /> entering any excavation below five (5) feet in depth. These measures will include sloping or shoring <br /> the walls of the excavation to protect individuals from hazards associated with cave-ins per OSHA 29 <br /> CFR 1920. Trenching will comply with 8 CFR 1539 to 1547. NO INDIVIDUAL is to enter an <br /> excavation until approved to do so by the SSHO. <br /> Prior to the excavation activities, we will insure that buried gas lines, water lines, electric cables, and <br /> other under underground utilities have been located by calling Underground Service Alert (USA). The <br /> project site will remain fenced until the excavation(s) have been backfilled and is no longer a safety <br /> risk. The SSHO will insure that unauthorized persons do not enter the site, and that all personnel on- <br /> site have proof of up to date OSHA 29 CFR 1910.120 Training. <br /> All personnel on-site will be required to wear Personal Protective Equipment as described in Section <br /> 7.3 of this HASP. A fire extinguisher will be placed in open view on site. <br /> UTILITIES: <br /> All related and non-related utilities above and below ground in the work area will be located by <br /> Underground Service Alert (USA), and visual search methods. If possible, the utilities directly related <br /> will be shut-off and disconnected prior to beginning the work. <br /> PAVEMENT: <br /> Concrete and asphalt will be removed by breaking it with a backhoe, bobcat, or jackhammer <br /> equipped with a pneumatic attachment, and loaded into a dump truck for proper recycling and/or <br /> disposal, or stockpiled on site for future removal. <br /> CLEAN- <br /> 11/07/2005 revision 5 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.