Laserfiche WebLink
UST Monitoring Site Plan <br /> 0 <br /> Site Address 124 W.ELM S1,Lodi,95240 <br /> MA 0 2 <br /> 4 <br /> Monitoring Plan Site Map CAW�"W_ <br /> aW <br /> sk=_511' <br /> Drawing NOT to Scale <br /> Business Name: Pacific Bell Telephone Co. dba AT&T Cal. (U E020) <br /> Business Address: 124 W Elm St Lodi <br /> W Elm St <br /> AT&T Building <br /> Engine Room Vent Riser <br /> in Base me nt <br /> Gen. Room Vent Line <br /> Floor Sensor(L4),,, Piping Sump <br /> 794380-208 wi Sensor(1-3) <br /> TLS 350 Plus--, 794380-208 <br /> -6 <br /> U) <br /> E 0 <br /> 0 <br /> 0 tH <br /> Ix tq <br /> 'LOU <br /> S GI <br /> r <br /> Uj Fill Sump <br /> UE020A0013 <br /> wt Sensor(L2) <br /> 660 gal. Day Tank Diesel Fuel Lines <br /> 794380-208 <br /> w/Annular Sensor <br /> (CI)794380-344 Annular Sensor ATG <br /> ILI)794390-420 <br /> Fire Box <br /> wl Sensor(L5) 4 N <br /> 794380-208 Overfill <br /> Alarm <br /> W E <br /> S <br /> Date map was drawn: 3/12/2015 <br /> Ins traction s <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System <br /> Certification. On your site plan,show the general layout of tanks and piping.Clearly identify locations of the following equipment,if <br /> installed:monitoring system control panels;sensors monitoring tank annular spaces, sumps,dispenser pans,spill containers,or other <br /> secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level probes(if used for leak detection).In the <br /> space provided,note the date this Site Plan was prepared, <br />