Laserfiche WebLink
�4 s <br /> F. In-Tank Gauging/SIR Equipment: M f, 22'0'` J <br /> F Check this box if tank gauging is used only for inventory control <br /> F Check this box if no tank gauging or SIR equipment'� stall <br /> a � �i <br /> g i gV <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the foil owm checklist <br /> i r Yes r No* Hasa input wrong been inspected for proper entry and termination,including testing for ground faults9 <br /> f Yes f No* Were all tank gauging augi gp probes visually inspected for damage and residue buildup? <br /> � <br /> ,.aax. - ��14X"u. K•..,.»: �R.,,.; ,:','. -uz�A£�;a��4;,i.e.�;..�,"f�..�h� �N 1.�,,,',..�","S44Siu,3::.a:N..`x',YlxT�"4Ce�' £ <br /> Yes No* Was accuracy of system product level readings tested? <br /> Yes No* Was accuracy of system water level readings tested? <br /> Yes No* Were all probes reinstalled properly? <br /> � x M ..: <br /> ..,... <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> I[F * " Forequipment start__.�..., <br /> Yes F Noup or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> F N/A all that apply) Simulated leak rate f 3 gp h 0 1 gp h F 02 g p h <br /> f� <br /> r Yes F No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> � Yes No* Was the testing apparatus properly calibrated? <br /> ,._. .._. ._ * For Ds does _ <br /> mechanical LL the LLD restrict product flow if it detects a leak? <br /> Yes F No P <br /> i N/A <br /> s <br /> Yes r No* For electronic LLDs,does the turbine automatically _the --- is a lea <br /> � shut offifthe LLD detects a leak? <br /> r N/A <br /> * For electronic LLD <br /> _ <br /> F Yes F No s,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> .W-y... : _.. F_. ::_ _... <br /> �_. <br /> Yes F No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ' F N/A fails a test? <br /> E <br /> ....._ <br /> F Yes r No* Forelectronic LLDs,have all accessible wiring connections been visually inspected? <br /> f N/A <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? ? <br /> *IntheSection H,below,describehow and when these deficiencies were or will becorrected. <br /> H. Comments: <br /> Suction System. <br />